Work-stream Validation:
Planning, coordination and documentation of all tasks in the areas
Validation of test methods:
• Inc Test Method
• AOI (automated optical inspection)
• Actuator Noise testing
• Flow and pressure measurement
Automated detection of surface anomalies
R&O Trading Company / Executive Director
ABB / In-situ NDT test procedure development
eight-seas / On shore fish project
Wolf -Thermomudule / Energy Plus House Kuwait
R&O Trading Company
Process development of Industry 4.0 production
Processes qualification and validation of
**Press-Pack IGBT Module
**LinPak Module
Prove of Concept of In-situ NDT test procedure
**Ceramic crack detection due to ultrasonic welding
Managing following tasks:
Production engineer for rotating engine components (Trend700)
(Material, equipment, tools, means of transportation, machinery)
Work-stream Validation:
Planning, coordination and documentation of all tasks in the areas
Validation of test methods:
• Inc Test Method
• AOI (automated optical inspection)
• Actuator Noise testing
• Flow and pressure measurement
Automated detection of surface anomalies
R&O Trading Company / Executive Director
ABB / In-situ NDT test procedure development
eight-seas / On shore fish project
Wolf -Thermomudule / Energy Plus House Kuwait
R&O Trading Company
Process development of Industry 4.0 production
Processes qualification and validation of
**Press-Pack IGBT Module
**LinPak Module
Prove of Concept of In-situ NDT test procedure
**Ceramic crack detection due to ultrasonic welding
Managing following tasks:
Production engineer for rotating engine components (Trend700)
(Material, equipment, tools, means of transportation, machinery)
Direktester geht's nicht! Ganz einfach Freelancer finden und direkt Kontakt aufnehmen.