Fachlicher Schwerpunkt dieses Freiberuflers

SAP Basis projects on UNIX, Linux, Windows with HANA, Oracle, MaxDB, MS Sql, Solution Manager1

Available from
Oct 14, 2019
Availability
100 %
on customer site
100 %
Areas

D0

D1

D2

D3

D4

D5

D6

D7

D8

D9

Austria

Switzerland

All others

Comment

Arbeitserlaubnis: european Weitere Länder: language of project german and/or english

Position

Comment


Schwerpunkt SAP

Project History

Certifications:

- HANA SP11 Operation & Administration
- HANA Installation SP11 

- ITIL Fondation v3

- SAP Basis, PI 7.3 
- OS DB Migration 7.3
  
Key projects within the last twenty years:

04.2015 - 12.2016  Fraport + T-Systems

  • Migration of Datacenter Hoyerswerda to Frankfurt a.M.
  • Planung / Migration of Sap Systems ( ERP / Portal / Business Connectors / Webdispatchers ) from AIX / Windows2008R2 / Oracle  to  Linux / Windows2012 R2 / Oracle / Maxdb / Sybase/HANA
  • Upgrade Projects, Solutim Manager 7.1 auf 7.2 + MIgration der Konfiguration EWAs, Monitoring
  • Migration Oracle DB2 / HANA SP10
  • Migration ERP EHP5 to S/4 HANA
  • Installation Sandbox HANA 2.0

04.2014 - 08.2014  Project BI Installation on Windows 2008 R2 + MSSQl 2012

  • Project SAP Sourcing + CLM Installation, AIX + Oracle
     

04.2014 - 08.2014 Messe Frankfurt a.M.

  • Project SAP Basis Consulting / Consulting of a Landscape with 20 Systems / Performance Monitoring 

10.2012 - 03.2014  SAP AG St. Leon Rot 

  • Administration of Market Place Systemes of SAP AG, Transition Projekt of MAXDB to HANA, Transition and migration of Market Place Servers ERP Systeme from Window 2003 to Windows 2008. Installation and connection of HANA /ERP /BI Systeme by SLT

09-2012 bis 10-2012  InfraServ GmbH , Frankfurt a.M.

  • Upgrade ERP Release 4.6 to ECC 6.0 EHP 5

 

08.2011 bis 09.2012  Project SAP RDS, Rapid Deployment Solution, SAP AG

  • Installation and configuration of Sap Products: NW 7.3 , TREX 7.02, ERP ECC 600 + EHP5 , EHP6, Business Obj Financial, Solman 7.10, IDM ( Oracle ), IDM ( MSSQL )
  • Installation and configuration Solution Manager System 7.1

01.2010 - 07.2011  Project SAP Coaching, T-Systems + Frankfurt Airport, Frankfurt a.M.
• Coaching and Training of employees during the transition of customer's SAP systems ( 250 Systems worldwide )
• Teamleader SAP Basis Operation since 01.05.2010

11.2009 – 12.2009  Project Insourcing BI Systems, SBB Switzerland Railways, Bern
• The transition of BI Systems from Outsourcing Company Servers ( Oracle / Windows )

08.2009 – 10.2009  Upgrade project ERP 2004 to ERP 2005 EhP4, Rathaus Mainz ( KDZ )
• Concept and design of the project
• Upgrade of ERP system
• Configuration and upgrade of Solution manager
• Upgrade of Oracle to 10.02.04
• Documentation

12.2005 - 07.2009  SAP Project Westdeutsche Immobillienbank, Germany, Mainz
• Adoption and continuation of the project. Administration and maintenance of an SAP landscape consisting of 22 installations of ABAP and Java systems
• Upgrade BW 3.5 to BI 7.0, Kernel 7:10
• Upgrade ECC2004 to  ECC 2005, Enhancement Pack. 3, kernel 7:10
• Upgrade Solution Manager 3.5 to 4.0, Kernel 7.0
• Introduction and configuration of the following modules in Solution Manager:
• Change Management ( MOPZ )
• Reporting Solution (Services, Admin, Change Management)
• Service Plan (SDCCN)
• Monitoring Solution (EWAlerts, SL Reporting, System Monitoring interface with HP Openview, Business Process Monitoring FI, CO, Portal)
• Configuration and  System Landscape Directory / ABAP and JAVA)
• Monitoring of all Oracle instances and Solaris Severs
• Job Scheduling Bachman
• Managing the wide landscape TMS
• Upgrade Oracle DBs on all tracks 10.2.0.2
• SAP installation and configuration
• SAP Upgrade
• Restore the SAP Kernel Packages
• SAP Support Packages
• Support for error situations
• Homogeneous system copies
• Care of the Oracle database server on Unix platform, Sun Solaris and Veritas Cluster

Customer References:

• Project SAP Basis support, 10/05 - present
• Reference by IT manager, bank financing specialist, from 20.01.09
• Very good experience/knowledge in all parts of the SAP Basis
• reliable
• Use large, even outside normal office hours (evenings, weekends)
• despite the high workload very good results "

07.2005 - 09.2005  Project Migration Control-SA R&V Versicherung
• Migration to a newer version of Control-SA should be considered. The project was planned for three months. Through optimization of project phases, it was ended within four weeks successfully. R&V evaluated this project as very successful.

01.2005 - 06.2005  Project Control-SA (Security Management) Postbank AG / BMC Software GmbH
• All 12,000 Users of SAP, UNIX, Lotus Notes, Windows, Oracle, and RACF should be centrally managed. Within nine months, I had my job as a consultant for the implementation of account takeover perceived from all systems. Control-SA was installed on a SUN four-node cluster.

06.2004 - 12.2004  Project City Hanover Patrol / BMC Software GmbH
• Within this project City, Hanover planned to monitor all the SAP systems, MS Outlook server, Unix, and Windows Server centrally monitored. My task consisted in connecting SAP systems to monitor the key application of BMC (Patrol).

03.2004 - 05.2004  PSO Project Workflow (Remedy) BMC Software GmbH
• The management of projects of the Professional Services at BMC had to be realized by functions of Remedy as a new application. This task was done on behalf of Remedy Suite 5.1.

11.2003 - 02.2004  Project Control-SA (Identity Management) / KFW (Kreditanstalt fur Wiederaufbau) / BMC Software GmbH
• Account management for several AIX 5.1 servers, Windows Active Directory, MS Outlook, and RACF. The project was evaluated as very successful by customer. My job was the implementation of the BMC associated products.

 

05.2003 - 10.2003 Project Patrol DWS (German securities specialists, Deutsche Bank, Frankfurt) / BMC Software GmbH
• My job was at the beginning installing of monitoring of Windows 2000 Server, Active Directory Server, MS-SQL Server, and IBM Windows cluster machines to allow. Automatic notification to administrators via email and SMS was planed as part of the project. Following the successful implementation of the project, I could DWS convince to monitor UNIX and Oracle servers by Patrol as well. This led to a follow-up contract for BMC Software, which was executed.

02.2003 - 04.2003  Yves Rocher Project Patrol / BMC Software GmbH
• Several UNIX servers (HP-UX), Windows 2000 Server and a Lotus Notes server should be monitored. The administrators should also be trained to work with  Knowledge modules and later to be able to develop their applications. My task consisted of connecting and configuring all the servers and compliance training for administrators. The project was evaluated as very successful by Yves Rocher AG.

06-2002 - 12.2002  SUN Project Factory DTCSM / BMC Software GmbH
• All local SUN servers of the German Telekom distributed nationwide in 120 offices had to be monitored by SUN Patrol Knowledge Module. Central distribution SUN packages made it possible. My task consisted of compiling the SUN packages, and deployment of scripts to automatically install after the distribution of the SUN packages. The project was realized in Münster and managed. Another task consisted of monitoring of 13 productive SAP systems by Patrol Knowledge Module for SAP. This task was also done centrally in Münster.

07.2001 - 12.2001  Project Patrol Federal Labor / BMC Software GmbH
• Multiple HP-UNIX, Windows and MS-SQL servers are under surveillance Patrol connected. Distribution to all offices nationwide has taken place.

03.2001 - 06.2001  Project INS2000 Ruhrgas AG / BMC Software GmbH
• SAP and UNIX systems at Ruhrgas AG in Essen had to be centrally monitored. My job was on behalf of SAP and UNIX administrators to install and configure the Knowledge Modules after their wish. After a test installation, all productive systems were connected under a console to be monitored.

01.1996 - 12.1999  Project SAP GK / debis Systemhaus AG
• Following the decision of our key customers (German Telekom), there should be a local installation of SAP R / 3 at the debris. This should be seen as a reference machine used to simulate the old applications in SAP. The responsibility for the installation, development, and administration of SAP and Oracle DB is transferred to me. A thesis of FH Darmstadt was Hosted by me within the project. The topic was: All data and communication interfaces in SAP. This work was rated as very good by FH Darmstadt.

09.1992 - 12-1995  Project VUS-GK / debis Systemhaus AG
• SD of German Telekom. A large project realized by 120 persons over 5 years. Within this project, customer information was held in three levels of central, local and office. Central data were on the mainframe ( DB2, CICS, and Cobol programs). Local data were presented at UNISYS with Informix database and PC. All systems communicated by interface programs. My tasks were within three years developing the system and interface programs in UNIX (C, SQL, Shell), Mainframe (C, COBOL, CICS)

References

Projekt SAP-Basis-Betreuung, 10/05 - dato
Referenz durch Leiter EDV, Bank Spezialfinanzierung, vom 20.01.09

"- sehr gute Erfahrung / Knowhow in allen Teilen der SAP-Basis
- zuverlässig
- großer Einsatz, auch außerhalb der üblichen Bürozeiten (abends, Wochenende)
- trotz hoher Arbeitsbelastung sehr gute Ergebnisse"

Industries

banks, insurance, IT, industry

Skills

Programming Languages
ABAP4
Basic
C
C++
Cobol
Delphi
Fortran
Java
JavaScript
Pascal
Perl
PHP
PL/SQL
Shell
Tcl/Tk

Operating Systems
HPUX
Lynx
Mac OS
MS-DOS
OSF/Motif
SUN OS, Solaris
Unix
Windows

Databases
DB2
HANA
MS SQL Server
MySQL
Oracle

Language Skills
English
writing / speaking skill
German
writing / speaking skill
Persian

Hardware
CD-Writer / Burner
FileNet
PC
Printer

Data Communication
APPC CPI-C RS232
CPIC
Ethernet
Internet, Intranet
RFC
RPC
SMTP
SNMP
Windows Network
Winsock

Products / Standards / Experiences
SAP Basis, ITIL, PMO

Training History

Computer scince TH-Darmstadt

 

Certificates:

 

- ITIL Fondation

- SAP Basis, PI 7.3 
- OS DB Migration 7.3  
×
×