Senior Expert for Project Management, Site Management, Quality Assurance, and all kinds of related Infrastructure. Civil Engineer over 36 years.
Aktualisiert am 13.03.2025
Profil
Freiberufler / Selbstständiger
Remote-Arbeit
Verfügbar ab: 01.04.2025
Verfügbar zu: 100%
davon vor Ort: 100%
Goal Directed Project Management
Qualitymanagement
Infrastrukturmanagement
Construction Site Supervision
Design for hydropower projects
Design for nuclear power plants
Design for Infrastructure projects
Design for Roadways
Design for Railways
Design for Tunneling
Design for Foundations
Design for sea port structures
Design for dams and dikes
Design for earthworks and rockworks
Any Project Management for listed tasks
Design for hazardous waste deposits and nuclear waste faccilities
Feasibiity studies
Steel Structures
Concrete Structures
English
excellent
German
Muttersprache
French
Grundkenntnisse
Spain
Grundkenntnisse
Arabic
Grundkenntnisse

Einsatzorte

Einsatzorte

Deutschland, Schweiz, Österreich
möglich

Projekte

Projekte

19 years 10 months
2005-05 - now

Various projects

CIVIL ENGINEERING EXPERT AND PROJECT MANAGER
CIVIL ENGINEERING EXPERT AND PROJECT MANAGER
6 months
2021-05 - 2021-10

Analysis of the status of project

Department for Commissioning of components, systems, and facilities for the first
plant until operation.
  • Team member for analysis of the status of project, review of the overall schedules and contracts, and planning the details for commissioning in three major phases for a detailed time schedule, resource and cost determination until the start of operation
  • Hereto consideration of the special allowance conditions for the plant with handling of radioactive waste containments in Germany for final safe permanent storage 900 m under surface
  • Cost of the entire project until start of operation: Estimated 3,500 Mio. EURO,
  • financed by the Government of Germany
BGE Federal Company for Permanent Repository mbH
Peine, Germany
2 years 11 months
2018-06 - 2021-04

Scharnebeck Ship Lifting Device Rehabilitation Project

Team Leader of Site Supervision Team and QM also in specialized work shops
Team Leader of Site Supervision Team and QM also in specialized work shops
  • Team Leader of Site Supervision Team and QM also in specialized work shops.
  • Site Supervision for the refurbishment and improvement works of Canal Ship Lifting Facility in Scharnebeck, West Trough
  • And quality assurance of all technical repair works, electrical works, mechanical and hydraulic works, steel works, and corrosion protection
  • Estimated project costs: 38 Mio. Euro. EURO
HRPI GmbH Engineers
GERMANY
9 months
2019-07 - 2020-03

Rufiji Dam and Hydropower Project TANZANIA

Coordinator and Senior Design Manager
Coordinator and Senior Design Manager
  • Power House design coordination for Client Elsewedy PSP, Cairo, Egypt.
  • Review and quality assurance of all design documents. And change basic and detail design for the power house with nine turbines, estimated 2,100 MW, in Nairobi and Dar Es Salaam
  • Basic design for the Balance of Plant infrastructure
  • Proposal for site installation for the power house, fist cost estimations
  • Reporting and first scheduling. Estimated cost 1.3 Billion USD
SMEC
Cairo, Nairobi, and Dar Es Salaam, Tanzania
5 months
2018-01 - 2018-05

Ibn Hammad Wadi Dam Project

Chief Resident Engineer
Chief Resident Engineer
  • Chief Resident Engineer for dam construction supervision, design review, Contract Management
  • For a combined 50 m high RCC dam with spillway and rock-fill abutment dams
  • Water intake chamber, pipe gallery, water outlet chamber, and access and grouting galleries in difficult rock fault zone. Estimated project costs: 50 Mio. EURO
Stucky Ltd., Lausanne, Switzerland (GPC SA).
JORDAN
1 year
2017-01 - 2017-12

Several Hydropower Projects

Senior Expert Engineer
Senior Expert Engineer
  • Senior Expert Engineer for dams, spillways, and power generation facilities
  • Hydropower project finishing report
  • Hydropower tender evaluation and report
  • Specialized Dept. Site Project Manager: Schedule of works and delay analysis for the New Assiut Nile Barrage Project with hydropower station, weir, bridges, navigation locks, dam, and auxiliary structures
  • Review of project documents and final report
Lahmeyer International GmbH, Bad Vilbel
GERMANY, EGYPT
1 year 6 months
2015-07 - 2016-12

Hydropower Project in the Seti River

Senior Project Manager/Team Leader
Senior Project Manager/Team Leader

  • Design Review, Tendering, and Site Supervision for Tanahu
  • Senior Project Manager/Team Leader for design reviews, change of detail designs, tendering phase, and Contract Management
  • Additional geological exploration for the 140 m high dam and spillway, power intake, head-race tunnel, surge tank, shaft and bifurcation, tail-race tunnel and outlet, cavern power house, and all access tunnels, operation and GIS buildings
  • Comprehending civil works, electrical and hydro-mechanical works
  • Reporting, cost estimation, and detailed schedule of construction works with MS-Project included. Power generation 2 x 63 MW
  • Estimated project costs of the entire project in case of a Chinese contractor: Total ca. 600 Mio. EURO

Nepal for Lahmeyer International GmbH, Bad Vilbel
NEPAL
3 years 1 month
2012-06 - 2015-06

Construction Design and Site Supervision

Senior Expert Engineer
Senior Expert Engineer

Construction Design and Site Supervision for Atbara River Hydropower and Irrigation Project DCUAP, and Gadaref Water Supply Project

  • Senior Expert Engineer for design review and detail designs, and as manager for site supervision of construction works of the power house and the power intake, penstocks, civil works and hydro-mechanical works. And for the two spillways of the two rivers. Reporting and schedules of works with Primavera P6 were included. Generation 4 x 80 MW
  • 895 Mio. EURO final project costs of the project with Chinese contractors CWE, CGTC and HEI (China Water and Electric Corporation, China Three-Gorges-Corporation, Harbin Electric Intern. Company)
  • And Chief Construction Engineer for the Gadaref Provincial town Water Supply Project comprehending Water Treatment Plant, two Pump Stations, Water Reservoirs, and 70 km pipelines DN 1000 mm, for 75,000 m³ supply per day. Change of detail designs and design reviews with Contractor CWE

Sudan for Lahmeyer International GmbH
SUDAN
3 years 3 months
2009-03 - 2012-05

Design for Advanced Nuclear Reactor Power Plants

Design works for the Producer of the European evolutionary pressurised
water reactor EPRTM of 1,600 MW, and for the new boiling water reactor
KERENATM of 1,100 MW electric power generation, and design reviews for

the in Japan designed reactor ATMEATM of 1,200 MW.

  • Detail design engineer in the AREVA NP department for Civil Engineering and Processing of New Plants - Special Tasks PECC-G - for establishing of technical EPC documents for international bids in cooperation with the central office in Paris, France. Elaboration of technical project documents for bids and tendering in France
  • Expert engineer for assessment and comparison of international civil standards and various nuclear standards utilized for EPC documents:
    • Finland, England, India, Emirates, France.
  • Design for concrete structures of nuclear auxiliary buildings, of cooling water structures, intakes, outlets, tunnels and channels, of sub-ground galleries, and of generator buildings. In England, Wylfa: Tunnel drilling machine in rock under the sea level
  • Elaboration of new EPC design procedures and specifications in accordance with international reactor safety standards, with national regulations for nuclear power plants, and with international standards for civil concrete structures
  • Review of French EDF technical design standards for reactors, and elaboration of fifteen new modifications with regard to the Eurocode standards becoming valid. Twelve modifications were accepted and implemented by EDF into the specific technical reactor specifications
  • Participation in elaboration of technical documents for four international biddings (EPC for England, Emirates, Finland and India), and for related comprehensive civil works interface documents in Paris and in Offenbach
  • Pre-design for the Balance of Plant of EPRTM nuclear power station complete infrastructure, also storm water and sewer drainage, and water supply, including BoQ and cost estimations
  • Six months field design change works on the construction site for the reactor building of the new EPRTM power plant Olkilouto 3 in Finland
  • Estimated costs of one block new nuclear power plant between 5,500 Million EURO and 8,500 Million EURO, depending on configurations, electrical capacity, and site specific conditions

Producer AREVA NP GmbH, Offenbach, (OSB-AG, Düsseldorf)
GERMANY, FRANCE, FINLAND
1 year
2008-01 - 2008-12

Industrial Fertilizer Production Plant Projects

Head of the Inspection and Expediting team
Head of the Inspection and Expediting team
  • Head of the Inspection and Expediting team of Uhde Egypt Ltd. for welding engineering and quality assurance. Fabrication of 18,300 t steel structures and 38 pressure vessels, and other equipment in Egypt for three large chemical industrial plants:
    • EAgrium Urea Fertilizer Plant Project in Damietta,
    • PDH/PP Polypropylene Synthesis Plant in Port Said,
    • SORFERT Urea Fertilizer Plant in Algeria.
  • Supervision and quality assurance in 14 steel workshops located all over Egypt. Team leader of 12 Egyptian specialist engineers. Workshop quality assurance audits in Egypt and in Istanbul (Turkey). Contract Management and Contracting:
    • Expediting, detailed reporting, and acceptance of fabrication of steel elements and pressure vessels in accordance with Uhde GmbH industrial standards and ASME. Estimated volume of Uhde project deliveries: 3,000 Mio. EURO. Financed by Egyptian and Algerian investors and governments
Egypt for Producer Uhde GmbH, Dortmund, and OSB-AG, Krefeld
EGYPT
3 months
2007-10 - 2007-12

Golen Gol Hydropower Project, Chitral Province

Expert detail design engineer
Expert detail design engineer
  • Expert detail design engineer for the construction of the power house and the switch-yard in the steep mountain region. Review of design concepts, new detail layout of the high head power house, concrete retaining walls, and the up to 250 m high rock cut slopes. Detailed dimensioning for concrete structures and technical installations with three Pelton turbines and adjusted transformers
  • The project comprehends a river diversion weir, 5 km high pressurised power tunnel, and the designed powerhouse with three turbines for 106 MW. Estimated volume of the project 92 Mio. EURO. Financed by Pakistan Government WAPDA and a consortium of banks
Pakistan for FICHTNER GmbH & Co. KG, Stuttgart, Germany
PAKISTAN
1 year 8 months
2006-03 - 2007-10

Lower Kokcha Hydropower and Irrigation Project

Lower Kokcha Hydropower and Irrigation Project, Provinces of Takhar, Rostak and Kunduz

  • Feasibility Study Phase 1 for a hydropower project and large irrigation area 1,680 km² using the water resources of the Kokcha River. Basis: Old Russian project dated 1976
  • The project comprehends in final study proposal one 60 m high river dam with spillways, 15.5 km water tunnels, and a main power house for estimated 70 MW. Further 4 channel-related power houses from 15 to 30 MW, and options for 240 km main irrigation channels with concrete lining, regulation and diversion-structures including bridges, aqueducts, and two pump house schemes. Additional 120 km new HV power transmission lines, and provincial roads and bridges upgrading as required for site access
  • Acting Project Manager, and expert for dam construction and civil structures for hydropower facilities. Coordination of participating international experts from Europe and from India. Contract Management and Contracting:
    • Geotechnical and geodetic survey of the project sites in the hillside area without roads by helicopter. Elaboration of parts of the feasibility study with several options of dam constructions, options for tunnels and channel alignments, options for power houses, designs and related cost estimations and schedules of works for construction
  • Assessment of existing channel structures related to the Amu Daria River considering upgrading. Designs and feasibility study report elaborated with team of Indian, Nepalese, and German experts
  • Estimated volume of the project: 1,350 Mio. EURO. Feasibility Study financed by Afghan Ministry for Energy and Water, Kabul, and World Bank

Afghanistan for FICHTNER GmbH & Co. KG, Stuttgart, Germany
AFGHANISTAN
2 years
2005-11 - 2007-10

Baghdara Hydropower Project

Senior Expert Engineer
Senior Expert Engineer

Baghdara Hydropower Project, Kapisa, Afghanistan

  • Feasibility Study Phase 1 for a hydropower project in the Province Kapisa. Use of the water resources of Panjshir River in the gorges within the mountain area North-East of Kabul
  • The project encloses several options of dams, tunnels and power houses. Senior Expert Engineer for design of dam construction and of civil structures for hydropower facilities. Geological exploration and survey of the project sites in the mountainous area without roads. Elaboration of parts of the feasibility study with designs for several options for dam constructions, options for tunnels, for power houses, comprehensive cost estimations, and schedules of works. First design for one 160 m high concrete dam, or smaller dams, up to 14 km power tunnels, access tunnels, options for caverns, and a main power house with 3 turbines for 230 MW. Final design for short headrace tunnel, penstock, power house and long access tunnel required in steep mountain area
  • Design and cost estimations also for road access for heavy traffic with length about 40 km, including bridges in mountain area and infrastructure. Estimated volume of the project: 650 Mio. EURO. Feasibility Study financed by Afghan Ministry for Energy and Water, Kabul, and World Bank

FICHTNER GmbH & Co. KG, Stuttgart, Germany
AFGHANISTAN
9 months
2005-09 - 2006-05

Band-e-Sultan Dam Works, Ghasni

Senior Project Manager
Senior Project Manager

Band-e-Sultan Dam Works, Ghasni, Afghanistan

  • Senior Project Manager for the emergency dam repair works, wing wall type concrete structure as replacement with earth- and clay-backfill, and rehabilitation of the 35 m high stone masonry dam with intakes and outlets, new spillway
  • Detail design, BoQ, tendering, and site supervision with support for the local Contractor. Contract Management and Contracting included. And concept of Micro Hydro Power turbine for 3 MW. And proposal of a concept for dam improvement and higher crest elevation for double reservoir storage capacity

FICHTNER GmbH & Co. KG, Stuttgart, Germany
4 months
2005-05 - 2005-08

Development of several infrastructure projects in Yemen

  • Project elaboration studies for infrastructure projects in Yemen including schedules of works (MS-Project) and cost estimations
YEMEN/GERMANY

Aus- und Weiterbildung

Aus- und Weiterbildung

6 years 1 month
1973-10 - 1979-10

Welding Engineer Diploma SLV/DVS

Technical University of Braunschweig (TUBS)
Technical University of Braunschweig (TUBS)
8 years 9 months
1964-04 - 1972-12

High school AE

Abitur?, degree AE (mathematics-natural sciences), Heinrich-Hertz-Schule? in Hamburg
Abitur?, degree AE (mathematics-natural sciences)
Heinrich-Hertz-Schule? in Hamburg

Position

Position

  • Senior Civil Engineer
  • Welding Engineer
  • Senior Project Manager

Kompetenzen

Kompetenzen

Top-Skills

Goal Directed Project Management Qualitymanagement Infrastrukturmanagement Construction Site Supervision Design for hydropower projects Design for nuclear power plants Design for Infrastructure projects Design for Roadways Design for Railways Design for Tunneling Design for Foundations Design for sea port structures Design for dams and dikes Design for earthworks and rockworks Any Project Management for listed tasks Design for hazardous waste deposits and nuclear waste faccilities Feasibiity studies Steel Structures Concrete Structures

Produkte / Standards / Erfahrungen / Methoden

Primavera P6
MS-Project
Bauer-AVA
SIDOUN WinAVA
RIB-AVA
MS-Office
RIB Trimas
Sofistik
AutoCAD 2012
Intergraph MicroStation
pcae 4 H-FRAP/4H-STAHL
RSTAB
STRAB
Data-samples of VOB
BGVR
UVV
AVA software of SIDOUN
CAD
MicroStation

SUMMARY OF EXPERIENCE:

  • Senior Expert for Project Management, Site Management, Quality Assurance, and all kinds of related Infrastructure
  • Senior Civil Engineer with over 36 years? experience for design and construction of civil structures, infrastructures, and project management
  • Head of design 1990 to 2001 comprehending projects of: Sewer networks, storm-water networks, water- and gas-supply, energy supply and illumination, roads, high speed railway lines, mining infrastructure
  • Design for concrete and steel structures, bridges, tunnels, ports, treatment and storage for radioactive and hazardous waste, municipal waste deposits, and design for urban infrastructures and for industrial plants
  • Design for weirs and dams, ponds, port quay structures, river- and seadikes
  • Design for hydropower projects, and design for nuclear power plants
  • Conduct of feasibility studies, tendering and contract negotiations, large construction works supervision
  • Expert for soil investigation and rock mechanics, geotechnics, foundation structures and specialized underground structures
  • 38 years? experience for civil construction site supervision, and for health and safety measures on construction sites


Contract Management:

  • FIDIC
  • World Bank
  • KfW Bank
  • Asian Development Bank
  • EPC projects
  • German VOB, VOL, VOF
  • Quality Management and Quality Assurance
  • JICA Japan International Cooperation Agency
  • EIB
  • QM EN ISO 9001:2008


Employment with over 36 years design and site supervision:

1982-01 - 1982-06

Role: Scientific Assistant at the chair of Prof. Simons

Customer: University foundation engineering and soil mechanic at TUBS


1982-07 - 1983-10

Customer: Engineering offices ?Grundbauingenieure Steinfeld und Partner (VBI),? Consulting Engineers for Soil Mechanic in Hamburg


1983-11 - 1985-06

Customer:  ?Prof. Dr.-Ing. H. Simons and Partner GmbH?, Consulting Engineers for Geotechnics, Braunschweig


1985-07 - 2005-04

Role: Consultant Engineer

Customer. ?Consulting Engineers Salzgitter GmbH (former ?Salzgitter Consult GmbH?) in Salzgitter-Bad


2005-05 - 2121-10

Role: Consultant Eng. 

Customer: Various Employers: Fichtner GmbH & Co KG, Areva NP, Lahmeyer International GmbH, Stucky Ltd., OSB-AG, HRPI


Tasks:

  • INP Engineers, limited contract for GBE in Peine, for colliery for final storage of nuclear waste Konrad, commissioning


Work Experience Abroad: 

  • Afghanistan, Egypt, Finland, France, Hungary, Jordan, Kazakhstan, Kenya, Kosovo, Nepal, Pakistan, Spain, Sudan, Tanzania, Yemen


Practical Training:

1973-02 - 1973-09

Role: Concrete building worker

Customer: ?Emil Planton Ltd.? in Hamburg

Einsatzorte

Einsatzorte

Deutschland, Schweiz, Österreich
möglich

Projekte

Projekte

19 years 10 months
2005-05 - now

Various projects

CIVIL ENGINEERING EXPERT AND PROJECT MANAGER
CIVIL ENGINEERING EXPERT AND PROJECT MANAGER
6 months
2021-05 - 2021-10

Analysis of the status of project

Department for Commissioning of components, systems, and facilities for the first
plant until operation.
  • Team member for analysis of the status of project, review of the overall schedules and contracts, and planning the details for commissioning in three major phases for a detailed time schedule, resource and cost determination until the start of operation
  • Hereto consideration of the special allowance conditions for the plant with handling of radioactive waste containments in Germany for final safe permanent storage 900 m under surface
  • Cost of the entire project until start of operation: Estimated 3,500 Mio. EURO,
  • financed by the Government of Germany
BGE Federal Company for Permanent Repository mbH
Peine, Germany
2 years 11 months
2018-06 - 2021-04

Scharnebeck Ship Lifting Device Rehabilitation Project

Team Leader of Site Supervision Team and QM also in specialized work shops
Team Leader of Site Supervision Team and QM also in specialized work shops
  • Team Leader of Site Supervision Team and QM also in specialized work shops.
  • Site Supervision for the refurbishment and improvement works of Canal Ship Lifting Facility in Scharnebeck, West Trough
  • And quality assurance of all technical repair works, electrical works, mechanical and hydraulic works, steel works, and corrosion protection
  • Estimated project costs: 38 Mio. Euro. EURO
HRPI GmbH Engineers
GERMANY
9 months
2019-07 - 2020-03

Rufiji Dam and Hydropower Project TANZANIA

Coordinator and Senior Design Manager
Coordinator and Senior Design Manager
  • Power House design coordination for Client Elsewedy PSP, Cairo, Egypt.
  • Review and quality assurance of all design documents. And change basic and detail design for the power house with nine turbines, estimated 2,100 MW, in Nairobi and Dar Es Salaam
  • Basic design for the Balance of Plant infrastructure
  • Proposal for site installation for the power house, fist cost estimations
  • Reporting and first scheduling. Estimated cost 1.3 Billion USD
SMEC
Cairo, Nairobi, and Dar Es Salaam, Tanzania
5 months
2018-01 - 2018-05

Ibn Hammad Wadi Dam Project

Chief Resident Engineer
Chief Resident Engineer
  • Chief Resident Engineer for dam construction supervision, design review, Contract Management
  • For a combined 50 m high RCC dam with spillway and rock-fill abutment dams
  • Water intake chamber, pipe gallery, water outlet chamber, and access and grouting galleries in difficult rock fault zone. Estimated project costs: 50 Mio. EURO
Stucky Ltd., Lausanne, Switzerland (GPC SA).
JORDAN
1 year
2017-01 - 2017-12

Several Hydropower Projects

Senior Expert Engineer
Senior Expert Engineer
  • Senior Expert Engineer for dams, spillways, and power generation facilities
  • Hydropower project finishing report
  • Hydropower tender evaluation and report
  • Specialized Dept. Site Project Manager: Schedule of works and delay analysis for the New Assiut Nile Barrage Project with hydropower station, weir, bridges, navigation locks, dam, and auxiliary structures
  • Review of project documents and final report
Lahmeyer International GmbH, Bad Vilbel
GERMANY, EGYPT
1 year 6 months
2015-07 - 2016-12

Hydropower Project in the Seti River

Senior Project Manager/Team Leader
Senior Project Manager/Team Leader

  • Design Review, Tendering, and Site Supervision for Tanahu
  • Senior Project Manager/Team Leader for design reviews, change of detail designs, tendering phase, and Contract Management
  • Additional geological exploration for the 140 m high dam and spillway, power intake, head-race tunnel, surge tank, shaft and bifurcation, tail-race tunnel and outlet, cavern power house, and all access tunnels, operation and GIS buildings
  • Comprehending civil works, electrical and hydro-mechanical works
  • Reporting, cost estimation, and detailed schedule of construction works with MS-Project included. Power generation 2 x 63 MW
  • Estimated project costs of the entire project in case of a Chinese contractor: Total ca. 600 Mio. EURO

Nepal for Lahmeyer International GmbH, Bad Vilbel
NEPAL
3 years 1 month
2012-06 - 2015-06

Construction Design and Site Supervision

Senior Expert Engineer
Senior Expert Engineer

Construction Design and Site Supervision for Atbara River Hydropower and Irrigation Project DCUAP, and Gadaref Water Supply Project

  • Senior Expert Engineer for design review and detail designs, and as manager for site supervision of construction works of the power house and the power intake, penstocks, civil works and hydro-mechanical works. And for the two spillways of the two rivers. Reporting and schedules of works with Primavera P6 were included. Generation 4 x 80 MW
  • 895 Mio. EURO final project costs of the project with Chinese contractors CWE, CGTC and HEI (China Water and Electric Corporation, China Three-Gorges-Corporation, Harbin Electric Intern. Company)
  • And Chief Construction Engineer for the Gadaref Provincial town Water Supply Project comprehending Water Treatment Plant, two Pump Stations, Water Reservoirs, and 70 km pipelines DN 1000 mm, for 75,000 m³ supply per day. Change of detail designs and design reviews with Contractor CWE

Sudan for Lahmeyer International GmbH
SUDAN
3 years 3 months
2009-03 - 2012-05

Design for Advanced Nuclear Reactor Power Plants

Design works for the Producer of the European evolutionary pressurised
water reactor EPRTM of 1,600 MW, and for the new boiling water reactor
KERENATM of 1,100 MW electric power generation, and design reviews for

the in Japan designed reactor ATMEATM of 1,200 MW.

  • Detail design engineer in the AREVA NP department for Civil Engineering and Processing of New Plants - Special Tasks PECC-G - for establishing of technical EPC documents for international bids in cooperation with the central office in Paris, France. Elaboration of technical project documents for bids and tendering in France
  • Expert engineer for assessment and comparison of international civil standards and various nuclear standards utilized for EPC documents:
    • Finland, England, India, Emirates, France.
  • Design for concrete structures of nuclear auxiliary buildings, of cooling water structures, intakes, outlets, tunnels and channels, of sub-ground galleries, and of generator buildings. In England, Wylfa: Tunnel drilling machine in rock under the sea level
  • Elaboration of new EPC design procedures and specifications in accordance with international reactor safety standards, with national regulations for nuclear power plants, and with international standards for civil concrete structures
  • Review of French EDF technical design standards for reactors, and elaboration of fifteen new modifications with regard to the Eurocode standards becoming valid. Twelve modifications were accepted and implemented by EDF into the specific technical reactor specifications
  • Participation in elaboration of technical documents for four international biddings (EPC for England, Emirates, Finland and India), and for related comprehensive civil works interface documents in Paris and in Offenbach
  • Pre-design for the Balance of Plant of EPRTM nuclear power station complete infrastructure, also storm water and sewer drainage, and water supply, including BoQ and cost estimations
  • Six months field design change works on the construction site for the reactor building of the new EPRTM power plant Olkilouto 3 in Finland
  • Estimated costs of one block new nuclear power plant between 5,500 Million EURO and 8,500 Million EURO, depending on configurations, electrical capacity, and site specific conditions

Producer AREVA NP GmbH, Offenbach, (OSB-AG, Düsseldorf)
GERMANY, FRANCE, FINLAND
1 year
2008-01 - 2008-12

Industrial Fertilizer Production Plant Projects

Head of the Inspection and Expediting team
Head of the Inspection and Expediting team
  • Head of the Inspection and Expediting team of Uhde Egypt Ltd. for welding engineering and quality assurance. Fabrication of 18,300 t steel structures and 38 pressure vessels, and other equipment in Egypt for three large chemical industrial plants:
    • EAgrium Urea Fertilizer Plant Project in Damietta,
    • PDH/PP Polypropylene Synthesis Plant in Port Said,
    • SORFERT Urea Fertilizer Plant in Algeria.
  • Supervision and quality assurance in 14 steel workshops located all over Egypt. Team leader of 12 Egyptian specialist engineers. Workshop quality assurance audits in Egypt and in Istanbul (Turkey). Contract Management and Contracting:
    • Expediting, detailed reporting, and acceptance of fabrication of steel elements and pressure vessels in accordance with Uhde GmbH industrial standards and ASME. Estimated volume of Uhde project deliveries: 3,000 Mio. EURO. Financed by Egyptian and Algerian investors and governments
Egypt for Producer Uhde GmbH, Dortmund, and OSB-AG, Krefeld
EGYPT
3 months
2007-10 - 2007-12

Golen Gol Hydropower Project, Chitral Province

Expert detail design engineer
Expert detail design engineer
  • Expert detail design engineer for the construction of the power house and the switch-yard in the steep mountain region. Review of design concepts, new detail layout of the high head power house, concrete retaining walls, and the up to 250 m high rock cut slopes. Detailed dimensioning for concrete structures and technical installations with three Pelton turbines and adjusted transformers
  • The project comprehends a river diversion weir, 5 km high pressurised power tunnel, and the designed powerhouse with three turbines for 106 MW. Estimated volume of the project 92 Mio. EURO. Financed by Pakistan Government WAPDA and a consortium of banks
Pakistan for FICHTNER GmbH & Co. KG, Stuttgart, Germany
PAKISTAN
1 year 8 months
2006-03 - 2007-10

Lower Kokcha Hydropower and Irrigation Project

Lower Kokcha Hydropower and Irrigation Project, Provinces of Takhar, Rostak and Kunduz

  • Feasibility Study Phase 1 for a hydropower project and large irrigation area 1,680 km² using the water resources of the Kokcha River. Basis: Old Russian project dated 1976
  • The project comprehends in final study proposal one 60 m high river dam with spillways, 15.5 km water tunnels, and a main power house for estimated 70 MW. Further 4 channel-related power houses from 15 to 30 MW, and options for 240 km main irrigation channels with concrete lining, regulation and diversion-structures including bridges, aqueducts, and two pump house schemes. Additional 120 km new HV power transmission lines, and provincial roads and bridges upgrading as required for site access
  • Acting Project Manager, and expert for dam construction and civil structures for hydropower facilities. Coordination of participating international experts from Europe and from India. Contract Management and Contracting:
    • Geotechnical and geodetic survey of the project sites in the hillside area without roads by helicopter. Elaboration of parts of the feasibility study with several options of dam constructions, options for tunnels and channel alignments, options for power houses, designs and related cost estimations and schedules of works for construction
  • Assessment of existing channel structures related to the Amu Daria River considering upgrading. Designs and feasibility study report elaborated with team of Indian, Nepalese, and German experts
  • Estimated volume of the project: 1,350 Mio. EURO. Feasibility Study financed by Afghan Ministry for Energy and Water, Kabul, and World Bank

Afghanistan for FICHTNER GmbH & Co. KG, Stuttgart, Germany
AFGHANISTAN
2 years
2005-11 - 2007-10

Baghdara Hydropower Project

Senior Expert Engineer
Senior Expert Engineer

Baghdara Hydropower Project, Kapisa, Afghanistan

  • Feasibility Study Phase 1 for a hydropower project in the Province Kapisa. Use of the water resources of Panjshir River in the gorges within the mountain area North-East of Kabul
  • The project encloses several options of dams, tunnels and power houses. Senior Expert Engineer for design of dam construction and of civil structures for hydropower facilities. Geological exploration and survey of the project sites in the mountainous area without roads. Elaboration of parts of the feasibility study with designs for several options for dam constructions, options for tunnels, for power houses, comprehensive cost estimations, and schedules of works. First design for one 160 m high concrete dam, or smaller dams, up to 14 km power tunnels, access tunnels, options for caverns, and a main power house with 3 turbines for 230 MW. Final design for short headrace tunnel, penstock, power house and long access tunnel required in steep mountain area
  • Design and cost estimations also for road access for heavy traffic with length about 40 km, including bridges in mountain area and infrastructure. Estimated volume of the project: 650 Mio. EURO. Feasibility Study financed by Afghan Ministry for Energy and Water, Kabul, and World Bank

FICHTNER GmbH & Co. KG, Stuttgart, Germany
AFGHANISTAN
9 months
2005-09 - 2006-05

Band-e-Sultan Dam Works, Ghasni

Senior Project Manager
Senior Project Manager

Band-e-Sultan Dam Works, Ghasni, Afghanistan

  • Senior Project Manager for the emergency dam repair works, wing wall type concrete structure as replacement with earth- and clay-backfill, and rehabilitation of the 35 m high stone masonry dam with intakes and outlets, new spillway
  • Detail design, BoQ, tendering, and site supervision with support for the local Contractor. Contract Management and Contracting included. And concept of Micro Hydro Power turbine for 3 MW. And proposal of a concept for dam improvement and higher crest elevation for double reservoir storage capacity

FICHTNER GmbH & Co. KG, Stuttgart, Germany
4 months
2005-05 - 2005-08

Development of several infrastructure projects in Yemen

  • Project elaboration studies for infrastructure projects in Yemen including schedules of works (MS-Project) and cost estimations
YEMEN/GERMANY

Aus- und Weiterbildung

Aus- und Weiterbildung

6 years 1 month
1973-10 - 1979-10

Welding Engineer Diploma SLV/DVS

Technical University of Braunschweig (TUBS)
Technical University of Braunschweig (TUBS)
8 years 9 months
1964-04 - 1972-12

High school AE

Abitur?, degree AE (mathematics-natural sciences), Heinrich-Hertz-Schule? in Hamburg
Abitur?, degree AE (mathematics-natural sciences)
Heinrich-Hertz-Schule? in Hamburg

Position

Position

  • Senior Civil Engineer
  • Welding Engineer
  • Senior Project Manager

Kompetenzen

Kompetenzen

Top-Skills

Goal Directed Project Management Qualitymanagement Infrastrukturmanagement Construction Site Supervision Design for hydropower projects Design for nuclear power plants Design for Infrastructure projects Design for Roadways Design for Railways Design for Tunneling Design for Foundations Design for sea port structures Design for dams and dikes Design for earthworks and rockworks Any Project Management for listed tasks Design for hazardous waste deposits and nuclear waste faccilities Feasibiity studies Steel Structures Concrete Structures

Produkte / Standards / Erfahrungen / Methoden

Primavera P6
MS-Project
Bauer-AVA
SIDOUN WinAVA
RIB-AVA
MS-Office
RIB Trimas
Sofistik
AutoCAD 2012
Intergraph MicroStation
pcae 4 H-FRAP/4H-STAHL
RSTAB
STRAB
Data-samples of VOB
BGVR
UVV
AVA software of SIDOUN
CAD
MicroStation

SUMMARY OF EXPERIENCE:

  • Senior Expert for Project Management, Site Management, Quality Assurance, and all kinds of related Infrastructure
  • Senior Civil Engineer with over 36 years? experience for design and construction of civil structures, infrastructures, and project management
  • Head of design 1990 to 2001 comprehending projects of: Sewer networks, storm-water networks, water- and gas-supply, energy supply and illumination, roads, high speed railway lines, mining infrastructure
  • Design for concrete and steel structures, bridges, tunnels, ports, treatment and storage for radioactive and hazardous waste, municipal waste deposits, and design for urban infrastructures and for industrial plants
  • Design for weirs and dams, ponds, port quay structures, river- and seadikes
  • Design for hydropower projects, and design for nuclear power plants
  • Conduct of feasibility studies, tendering and contract negotiations, large construction works supervision
  • Expert for soil investigation and rock mechanics, geotechnics, foundation structures and specialized underground structures
  • 38 years? experience for civil construction site supervision, and for health and safety measures on construction sites


Contract Management:

  • FIDIC
  • World Bank
  • KfW Bank
  • Asian Development Bank
  • EPC projects
  • German VOB, VOL, VOF
  • Quality Management and Quality Assurance
  • JICA Japan International Cooperation Agency
  • EIB
  • QM EN ISO 9001:2008


Employment with over 36 years design and site supervision:

1982-01 - 1982-06

Role: Scientific Assistant at the chair of Prof. Simons

Customer: University foundation engineering and soil mechanic at TUBS


1982-07 - 1983-10

Customer: Engineering offices ?Grundbauingenieure Steinfeld und Partner (VBI),? Consulting Engineers for Soil Mechanic in Hamburg


1983-11 - 1985-06

Customer:  ?Prof. Dr.-Ing. H. Simons and Partner GmbH?, Consulting Engineers for Geotechnics, Braunschweig


1985-07 - 2005-04

Role: Consultant Engineer

Customer. ?Consulting Engineers Salzgitter GmbH (former ?Salzgitter Consult GmbH?) in Salzgitter-Bad


2005-05 - 2121-10

Role: Consultant Eng. 

Customer: Various Employers: Fichtner GmbH & Co KG, Areva NP, Lahmeyer International GmbH, Stucky Ltd., OSB-AG, HRPI


Tasks:

  • INP Engineers, limited contract for GBE in Peine, for colliery for final storage of nuclear waste Konrad, commissioning


Work Experience Abroad: 

  • Afghanistan, Egypt, Finland, France, Hungary, Jordan, Kazakhstan, Kenya, Kosovo, Nepal, Pakistan, Spain, Sudan, Tanzania, Yemen


Practical Training:

1973-02 - 1973-09

Role: Concrete building worker

Customer: ?Emil Planton Ltd.? in Hamburg

Vertrauen Sie auf Randstad

Im Bereich Freelancing
Im Bereich Arbeitnehmerüberlassung / Personalvermittlung

Fragen?

Rufen Sie uns an +49 89 500316-300 oder schreiben Sie uns:

Das Freelancer-Portal

Direktester geht's nicht! Ganz einfach Freelancer finden und direkt Kontakt aufnehmen.