The scope of the e-NG Terminal Project includes full engineering, procurement, and construction contract to construct an e-NG (electric Natural Gas) import terminal in Wilhelmshaven. Tractebel is awarded to support the Client as an Owner?s Engineer (OE) with following Scope of Work (SoW): technical due diligence of e-NG Terminal Project, technical evaluation of the EPC offers, review and commenting of project documentation prepared by EPC Contractor and third parties, participation in Project reviews, coordination at place, Project support for the permitting activities and documentation, commissioning support and additional scope on reimbursable basis.
Development of the Battery Energy Storage Systems (BESS) with a capacity of 100 MW / 400 MWh on Engie's Kallo site in Belgium. It includes installation of battery containers, electrical auxiliaries, step-up transformer and utility systems covering an area of approximately 1,7 hectares.
The Client is developing a 500 MW electrolysis plant for the production of green hydrogen on a greenfield site in Germany. The produced hydrogen shall be injected into a newbuilt gas transmission pipeline. The services of Tractebel include:
Responsibilities:
Safety Concept and consequence analysis Conceptual Design
Development of the Battery Energy Storage Systems (BESS) with a capacity of 100 MW / 440 MWh on Engie's Puglianello site in Italy. It includes installation of battery containers, electrical auxiliaries, step-up transformer and utility systems covering an area of approximately 2 x 1,6 hectares.
Responsibilities:
Implementation of BMW safety requirements to BCP21 Project Experts Mission and Consultancy, Project management
Responsibilities:
Construction of a new Atmospheric, refrigerated double-walled Ammonia Storage Tank with loading/unloading and all related facilities at Aqaba - Jordan
Responsibilities:
TAPI gas pipeline project aims to export up to 29.2 billion cubic meters of natural gas per annum from Turkmenistan through Afghanistan & Pakistan to India. The Galkynysh gas field will feed the TAPI pipeline. Length for AFG & PAK section is 1625km with 6 Compressor Stations, 6 Offtake Stations, 2 Metering Stations, 50 Block Valve Stations. Pipeline diameter is 56
Greenfield, recoverable reserves 55 mmboe / 362 bcf gas, 10 production wells, CPF with a total plant production capacity of 100 mmscfd sour gas and 7 mbd LPG, 24? gas and 6? LPG export pipelines
Certificates
OTHER TRAININGS
Profile
COMPUTER SKILLS
PROFESIONAL SKILLS
COUNTRIES OF WORK EXPERIENCE
Responsibilities:
The scope of the e-NG Terminal Project includes full engineering, procurement, and construction contract to construct an e-NG (electric Natural Gas) import terminal in Wilhelmshaven. Tractebel is awarded to support the Client as an Owner?s Engineer (OE) with following Scope of Work (SoW): technical due diligence of e-NG Terminal Project, technical evaluation of the EPC offers, review and commenting of project documentation prepared by EPC Contractor and third parties, participation in Project reviews, coordination at place, Project support for the permitting activities and documentation, commissioning support and additional scope on reimbursable basis.
Development of the Battery Energy Storage Systems (BESS) with a capacity of 100 MW / 400 MWh on Engie's Kallo site in Belgium. It includes installation of battery containers, electrical auxiliaries, step-up transformer and utility systems covering an area of approximately 1,7 hectares.
The Client is developing a 500 MW electrolysis plant for the production of green hydrogen on a greenfield site in Germany. The produced hydrogen shall be injected into a newbuilt gas transmission pipeline. The services of Tractebel include:
Responsibilities:
Safety Concept and consequence analysis Conceptual Design
Development of the Battery Energy Storage Systems (BESS) with a capacity of 100 MW / 440 MWh on Engie's Puglianello site in Italy. It includes installation of battery containers, electrical auxiliaries, step-up transformer and utility systems covering an area of approximately 2 x 1,6 hectares.
Responsibilities:
Implementation of BMW safety requirements to BCP21 Project Experts Mission and Consultancy, Project management
Responsibilities:
Construction of a new Atmospheric, refrigerated double-walled Ammonia Storage Tank with loading/unloading and all related facilities at Aqaba - Jordan
Responsibilities:
TAPI gas pipeline project aims to export up to 29.2 billion cubic meters of natural gas per annum from Turkmenistan through Afghanistan & Pakistan to India. The Galkynysh gas field will feed the TAPI pipeline. Length for AFG & PAK section is 1625km with 6 Compressor Stations, 6 Offtake Stations, 2 Metering Stations, 50 Block Valve Stations. Pipeline diameter is 56
Greenfield, recoverable reserves 55 mmboe / 362 bcf gas, 10 production wells, CPF with a total plant production capacity of 100 mmscfd sour gas and 7 mbd LPG, 24? gas and 6? LPG export pipelines