Ich möchte bevorzugt für Projekte mit remote-Arbeit kontaktiert werden. Präsenz-Meetings sind z.B. zum Projektstart in ganz Europa möglich.
Project Type: Quality Management (QM)
Description: Preparation of master plans, manuals, SOPs; CAPA system optimization; big pharma
Date: 02-11/2010
Project Type: Quality Management
Description: Concept and design training system
Date: 02-04/2014
Project Type: Quality Management, Work and Organizational Psychology
Description: QM System Design Analytical drug laboratory, GMP training, preparation of SOPs, data analysis and reviews of analytical methods using statistical methods, regulatory support herbal medicines (for example, files, package insert, patient information)
Date: 11/2014-01/2015
Project Type: FDA Inspection
Description: GMP / GLP testing laboratory: preparation / monitoring FDA inspection, Preparation of SOPs, reports
Date: 03-04/2014
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; GMP System Design, Evaluation Stability Data / Stability Report
Date: 03/2013-11/2014
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; Execution of validations / Preparation of validation reports
Date: 04/2013-04/2014
Project Type: Regulatory / CMC
Description: Evaluation and reporting on regulatory dossiers, regulatory assessments
Date: 07-08/2014
Project Type: Regulatory / CMC
Description: Preparation of various pharmaceutical dossiers (2007-2015) for the same customer, e.g. for Japan, USA, Canada, EU, including method review, optimization SOPs and analytical methods
Date: 2007-2015
Project Type: Survey QM
Description: Conducting company survey on QM topics / FDA inspection; presentation of results
Date: 10/2014 & 06/2015
Project Type: Quality Management
Description: Evaluation and reporting on changes / deviations before an FDA inspection
Date:06/2014
Project Type: Regulatory / CMC
Description: Compilation of a dossier (biotech product), including optimization of SOP and Quality Manual
Date: 12/2013-12/2014
Project Type: FDA Inspection
Description: GMP Medical Device: Preparation of / support during FDA inspection, Preparation of SOPs, reports
Date: 06-07/2014
Project Type: FDA Inspection
Description: GMP Medical Device (electronic cardio monitoring system): preparation / optimization SMF, Quality Manual, VMP, SOPs, forms, method reports; Accompanying FDA inspections at 2 locations (21 CFR 820)
Date: 03-06/2015
Project Type: Auditor Training (GMP), Survey QM
Description: Conducting training, design, evaluation, presentation employee survey, compilation of a Quality Manual
Date: 06/2015 & 03/2016
Project Type: Quality Management
Description: Support in preparing SMF, Quality Manual, VMP, SOPs, forms, method reports
Date: 06/2015
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; performance of validations / Preparation of validation report
Date: 07/2015
Project Type: Quality Management
Description: Compilation of a Quality Manual, review and optimization of SOPs
Date: 06-10/2015
Project Type: Regulatory / CMC
Description: Preparation of registration documentation Module 3 (DS / DP) Pharma, three different drugs
Date: 01/2015-03/2016
Project Type: FDA Inspection
Description: GMP Medical Device / Combination Product: Project Management (responsible project leader), Preparation of / support during FDA Inspection Combination Product (21 CFR 4), preparation of SOPs, (Experience) Reports, Statements, Concepts
Date: 03-07/2016
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; GMP System Design optimization
Date: 07-09/2016
Project Type: Regulatory / CMC; Quality Management
Description: Preparation and updating of technical documentation (STED), Essential Requirements lists; QM for IVDs, preparation of GAP remediation plan and project planning; Usability / Human Factors and Usability Engineering (IEC 62366 / FDA CDRH)
Date: 09/2016-04/2017
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; GMP System Design and Optimization
Date: 05-07/2017
Project Type: Quality Management
Description: QM Pharma, concept validation strategy / close-down & transfer of a location, preparation of documents e.g. VMP, transfer concept
Date: 07/2017-05/2018
Project Type: Quality Management; Regulatory / CMC
Description: Support in preparing MDSAP Audit, compliance check
Date: 07-08/2018
Project Type: Quality Management
Description:
Concept and implementation of a QM System for a Pharmaceutical Entrepreneur / Distributor, preparation of a tailored Quality Manual, SOPs, Supplier / Contract manufacturer Audits, Regulatory Audits, GDP, responsible external QM Manager, communication with local authorities.
Audits, due to Corona pandemic remote audits:
06/2020: contract manufacturer qualification as document & online audit (manufacturer, regulatory, QM and general services
09/2020: contract manufacturer qualification as document audit & video audit (manufacturer in France, GMP/GDP)
11/2020: contract manufacturer qualification as document & video audit (archiving service)
04/2021: contract manufacturer qualification as document & video audit (logistics, GDP)
06/2021: selection process
and qualification by questionnaire of pharmacovigilance contract service
provider
06/2021: contract manufacturer qualification as online/video audit (manufacturer, GMP)
Date: 04/2018-07/2021
Project Type: Quality Management and Regulatory Affairs
Description: Gap-analysis and optimization of QM system, with regard to FDA / IVDR readiness (Medical Device manufacturer); support URS, selection process and customizing of new CAPA software and procedure; supporting preparation of 510(k) documents and technical documentation, Intended Use (Product Claim) acc. to IVDR / MDR Article 7 for various products; application of IVDR/MDR rules for correct registration according to Product Claim and advice regarding content of IFU, labelling; conducting online-trainings on QM topics and internal audits according to ISO 13485:2016; project lead and final project evaluation (questionnaire)
Date: 09/2020-09/2022
Project type: Quality Management
Description: Concept and implementation of an evaluation system for reprocessing of reusable medical devices (cf. FDA ?Guidance Reprocessing Medical Devices in Health Care Settings: Validation Methods and Labeling?; ISO 17664:2017; Recommendation from the Commission on Hospital Hygiene and Infection Protection at the Robert Koch Institute (RKI) and the Federal Institute for Drugs and Medical Devices (BfArM) on the "Hygiene requirements for the reprocessing of medical devices"), MDR readiness, authoring of scientific / literature-based Peer Reviews, Reporting; Biocompatibility Assessment for Implants. Biocompatibility Evaluations (extractables/leachables), according to ISO 10933 for a series for polymer implants, together with a toxicologist, including interpretation of MS spectra measured by a contract lab (evaluation reports); answering deficiency letters of notified body.
Date: 10/2018-05/2020 and 07/2021-12/2022
Project type: Quality Management / Regulytory Affairs
Description: Advanced Therapy Medicinal Product (ATMP), Gene Therapy Medicinal Product (GTMP): Compilation of an FDA Master File
Date: 10/2022-02/2023
Project type: Quality Management
Description: Support QM/QS for an Advanced Therapy Medicinal Product (ATMP) manufacturer start-up, before inspection by competent authority to receive manufacturing authorization according to §13 AMG; including writing/review/comments of answers to deficiency letters, documents, trainings
Date: 02/2023-08/2023
Project type: Quality
Management; Regulatory / CMC
Description: Start-up:
Preparation of DIN EN ISO 13485 readiness, project management. Issue of
technical documentation for two MDR class III devices, one according to ANNEX
XVI ? ?List of groups of products without an intended medical purpose referred
to in article 1(2)?; audit and project communication with CDMO in Italy
(documents Italian/English, project language English). Accompaniment of regulatory approval process
from R&D phase to market / PMS
Date: 09/2023 - 11/2025 (low capacity project)
Project type: Quality Management
Description: Hands-on support and optimization strategy for the QM system, e.g., writing SOPs like CAPA, reprocessing/reworking, risk management, performing trainings, for a global API, Excipient, Cosmetics, Nutrition etc. manufacturer and CDMO/CMO. Trainings on QM topics.
Date: 03/2023-02/2024; Trainings 06/2024-03/2025
Project type: Quality Management
Description:
Part 1 - Medical devices (implants),
global company: Hands-on support QM and optimization strategy &
implementation for the QM system, e.g., writing SOPs, processing of CAPA, SME
in corp audits; Test Method Validation, e.g., XRD according to ICH Q2(R2) and
MSA Measurement System Analysis (six sigma).
Part 2 - Test method implementation: IQ/OQ for test equipment and TMV for a complex analytical method
Date: Part 1 - 03/2024 - 12/2025; Part 2 - : 04/2026 - 10/2026
Medical Devices / Pharma Project Management (Europe, USA, Japan), Quality Management, GMP Guidelines and Legislation, e.g., AMWHV, EU-GMP Guideline, ICH Guidelines and FDA/USA 21 CFR 4, 11, 210/211, 820; MEDDEV, MPG, MDD, 93/42/EWG, MDR/IVDR 2017/745-746; MDSAP); Usability (Usability / Human Factors and Usability Engineering acc. to IEC 62366 / FDA CDRH); DIN EN ISO 13485:2012/2016; Audits / Inspections e.g. FDA; Regulatory Affairs, e.g., Medical Devices (510(k), former STED Format), Pharma CMC Part ? Module 3, Combination Products / Companion Products, Phyto-Pharmaceuticals, e.g., Registration in Germany Europe, USA, Japan, Korea, Canada, Australia, Brazil); Work- and Organizational Psychology, Communication, Stress-Management, Audit Psychology - audit preparation of personnel, In-House Training & Lecturer for Quality Management.
1997:
Diploma in Chemistry (Dipl.-Chem.)
Free University (FU) Berlin, Germany
Grade: A
1998 ? 2001:
Doctorate in Physical Chemistry (Dr. rer. nat.)
Free University (FU) Berlin, Germany
[URL on request]
Grade: magna cum laude
2008 ? 2012:
Bachelor in Psychology (B.Sc.),
University of Hagen, Germany | extra-occupational
Full empirical study on Delay of Gratification and Procrastination, in English.
Grade: C (2.4)
2012 ? 2014:
Master in Psychology (M.SC)
University of Hagen, Germany | extra-occupational
Full empirical study on Test Anxiety, in English.
Grade: B (1.9)
10|2014 & 11|2014:
Advanced training on stress management ?train-the-trainer?
2015:
Training on ?Project Management - A Professional Training Course? (University Hagen)
Pharma & Medical Devices Project Management (Europe, USA, Japan)
Medical Devices, IVD & Pharma Project Management
(Europa, USA, Japan), Quality Management, GMP / GDP Guidelines and Legislation
(e.g., AMWHV, AMG, GDP 2013/C 343/01, EU-GMP Guideline, ICH Guidelines und
FDA/USA 21 CFR 4, 11, 210/211, 820; MEDDEV/MDCG, MPG/MPDG, MDR (EU) 2017/745,
IVDR (EU) 2017/746); Usability (Usability / Human Factors and Usability
Engineering acc. to IEC 62366 / FDA CDRH); DIN EN ISO 13485:2016; Audits /
Inspections; Regulatory Affairs Medical Devices (510(k), former STED Format ((n)IVDMAToC)
and Pharma (CMC Part ? Module 3 or Master Files for Combination Products /
Companion Products, Phyto-Pharmaceuticals, ATMP, ex-vivo GTMP), for registration
in e.g., Germany, Europe, USA, Japan, Korea, Canada, Australia, Brazil; Food
HACCP/GMP; CSV GAMP®5, 21CFR Part11; EU GMP Annex11; Work and Organizational
Psychology, Communication, Stress Management
Publications, organizations and author activities on request
Medical Devices, Pharmaceutical Industry
Ich möchte bevorzugt für Projekte mit remote-Arbeit kontaktiert werden. Präsenz-Meetings sind z.B. zum Projektstart in ganz Europa möglich.
Project Type: Quality Management (QM)
Description: Preparation of master plans, manuals, SOPs; CAPA system optimization; big pharma
Date: 02-11/2010
Project Type: Quality Management
Description: Concept and design training system
Date: 02-04/2014
Project Type: Quality Management, Work and Organizational Psychology
Description: QM System Design Analytical drug laboratory, GMP training, preparation of SOPs, data analysis and reviews of analytical methods using statistical methods, regulatory support herbal medicines (for example, files, package insert, patient information)
Date: 11/2014-01/2015
Project Type: FDA Inspection
Description: GMP / GLP testing laboratory: preparation / monitoring FDA inspection, Preparation of SOPs, reports
Date: 03-04/2014
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; GMP System Design, Evaluation Stability Data / Stability Report
Date: 03/2013-11/2014
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; Execution of validations / Preparation of validation reports
Date: 04/2013-04/2014
Project Type: Regulatory / CMC
Description: Evaluation and reporting on regulatory dossiers, regulatory assessments
Date: 07-08/2014
Project Type: Regulatory / CMC
Description: Preparation of various pharmaceutical dossiers (2007-2015) for the same customer, e.g. for Japan, USA, Canada, EU, including method review, optimization SOPs and analytical methods
Date: 2007-2015
Project Type: Survey QM
Description: Conducting company survey on QM topics / FDA inspection; presentation of results
Date: 10/2014 & 06/2015
Project Type: Quality Management
Description: Evaluation and reporting on changes / deviations before an FDA inspection
Date:06/2014
Project Type: Regulatory / CMC
Description: Compilation of a dossier (biotech product), including optimization of SOP and Quality Manual
Date: 12/2013-12/2014
Project Type: FDA Inspection
Description: GMP Medical Device: Preparation of / support during FDA inspection, Preparation of SOPs, reports
Date: 06-07/2014
Project Type: FDA Inspection
Description: GMP Medical Device (electronic cardio monitoring system): preparation / optimization SMF, Quality Manual, VMP, SOPs, forms, method reports; Accompanying FDA inspections at 2 locations (21 CFR 820)
Date: 03-06/2015
Project Type: Auditor Training (GMP), Survey QM
Description: Conducting training, design, evaluation, presentation employee survey, compilation of a Quality Manual
Date: 06/2015 & 03/2016
Project Type: Quality Management
Description: Support in preparing SMF, Quality Manual, VMP, SOPs, forms, method reports
Date: 06/2015
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; performance of validations / Preparation of validation report
Date: 07/2015
Project Type: Quality Management
Description: Compilation of a Quality Manual, review and optimization of SOPs
Date: 06-10/2015
Project Type: Regulatory / CMC
Description: Preparation of registration documentation Module 3 (DS / DP) Pharma, three different drugs
Date: 01/2015-03/2016
Project Type: FDA Inspection
Description: GMP Medical Device / Combination Product: Project Management (responsible project leader), Preparation of / support during FDA Inspection Combination Product (21 CFR 4), preparation of SOPs, (Experience) Reports, Statements, Concepts
Date: 03-07/2016
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; GMP System Design optimization
Date: 07-09/2016
Project Type: Regulatory / CMC; Quality Management
Description: Preparation and updating of technical documentation (STED), Essential Requirements lists; QM for IVDs, preparation of GAP remediation plan and project planning; Usability / Human Factors and Usability Engineering (IEC 62366 / FDA CDRH)
Date: 09/2016-04/2017
Project Type: Quality Management
Description: Preparation of SMF, Quality Manual, VMP, SOPs, forms, method reports; GMP System Design and Optimization
Date: 05-07/2017
Project Type: Quality Management
Description: QM Pharma, concept validation strategy / close-down & transfer of a location, preparation of documents e.g. VMP, transfer concept
Date: 07/2017-05/2018
Project Type: Quality Management; Regulatory / CMC
Description: Support in preparing MDSAP Audit, compliance check
Date: 07-08/2018
Project Type: Quality Management
Description:
Concept and implementation of a QM System for a Pharmaceutical Entrepreneur / Distributor, preparation of a tailored Quality Manual, SOPs, Supplier / Contract manufacturer Audits, Regulatory Audits, GDP, responsible external QM Manager, communication with local authorities.
Audits, due to Corona pandemic remote audits:
06/2020: contract manufacturer qualification as document & online audit (manufacturer, regulatory, QM and general services
09/2020: contract manufacturer qualification as document audit & video audit (manufacturer in France, GMP/GDP)
11/2020: contract manufacturer qualification as document & video audit (archiving service)
04/2021: contract manufacturer qualification as document & video audit (logistics, GDP)
06/2021: selection process
and qualification by questionnaire of pharmacovigilance contract service
provider
06/2021: contract manufacturer qualification as online/video audit (manufacturer, GMP)
Date: 04/2018-07/2021
Project Type: Quality Management and Regulatory Affairs
Description: Gap-analysis and optimization of QM system, with regard to FDA / IVDR readiness (Medical Device manufacturer); support URS, selection process and customizing of new CAPA software and procedure; supporting preparation of 510(k) documents and technical documentation, Intended Use (Product Claim) acc. to IVDR / MDR Article 7 for various products; application of IVDR/MDR rules for correct registration according to Product Claim and advice regarding content of IFU, labelling; conducting online-trainings on QM topics and internal audits according to ISO 13485:2016; project lead and final project evaluation (questionnaire)
Date: 09/2020-09/2022
Project type: Quality Management
Description: Concept and implementation of an evaluation system for reprocessing of reusable medical devices (cf. FDA ?Guidance Reprocessing Medical Devices in Health Care Settings: Validation Methods and Labeling?; ISO 17664:2017; Recommendation from the Commission on Hospital Hygiene and Infection Protection at the Robert Koch Institute (RKI) and the Federal Institute for Drugs and Medical Devices (BfArM) on the "Hygiene requirements for the reprocessing of medical devices"), MDR readiness, authoring of scientific / literature-based Peer Reviews, Reporting; Biocompatibility Assessment for Implants. Biocompatibility Evaluations (extractables/leachables), according to ISO 10933 for a series for polymer implants, together with a toxicologist, including interpretation of MS spectra measured by a contract lab (evaluation reports); answering deficiency letters of notified body.
Date: 10/2018-05/2020 and 07/2021-12/2022
Project type: Quality Management / Regulytory Affairs
Description: Advanced Therapy Medicinal Product (ATMP), Gene Therapy Medicinal Product (GTMP): Compilation of an FDA Master File
Date: 10/2022-02/2023
Project type: Quality Management
Description: Support QM/QS for an Advanced Therapy Medicinal Product (ATMP) manufacturer start-up, before inspection by competent authority to receive manufacturing authorization according to §13 AMG; including writing/review/comments of answers to deficiency letters, documents, trainings
Date: 02/2023-08/2023
Project type: Quality
Management; Regulatory / CMC
Description: Start-up:
Preparation of DIN EN ISO 13485 readiness, project management. Issue of
technical documentation for two MDR class III devices, one according to ANNEX
XVI ? ?List of groups of products without an intended medical purpose referred
to in article 1(2)?; audit and project communication with CDMO in Italy
(documents Italian/English, project language English). Accompaniment of regulatory approval process
from R&D phase to market / PMS
Date: 09/2023 - 11/2025 (low capacity project)
Project type: Quality Management
Description: Hands-on support and optimization strategy for the QM system, e.g., writing SOPs like CAPA, reprocessing/reworking, risk management, performing trainings, for a global API, Excipient, Cosmetics, Nutrition etc. manufacturer and CDMO/CMO. Trainings on QM topics.
Date: 03/2023-02/2024; Trainings 06/2024-03/2025
Project type: Quality Management
Description:
Part 1 - Medical devices (implants),
global company: Hands-on support QM and optimization strategy &
implementation for the QM system, e.g., writing SOPs, processing of CAPA, SME
in corp audits; Test Method Validation, e.g., XRD according to ICH Q2(R2) and
MSA Measurement System Analysis (six sigma).
Part 2 - Test method implementation: IQ/OQ for test equipment and TMV for a complex analytical method
Date: Part 1 - 03/2024 - 12/2025; Part 2 - : 04/2026 - 10/2026
Medical Devices / Pharma Project Management (Europe, USA, Japan), Quality Management, GMP Guidelines and Legislation, e.g., AMWHV, EU-GMP Guideline, ICH Guidelines and FDA/USA 21 CFR 4, 11, 210/211, 820; MEDDEV, MPG, MDD, 93/42/EWG, MDR/IVDR 2017/745-746; MDSAP); Usability (Usability / Human Factors and Usability Engineering acc. to IEC 62366 / FDA CDRH); DIN EN ISO 13485:2012/2016; Audits / Inspections e.g. FDA; Regulatory Affairs, e.g., Medical Devices (510(k), former STED Format), Pharma CMC Part ? Module 3, Combination Products / Companion Products, Phyto-Pharmaceuticals, e.g., Registration in Germany Europe, USA, Japan, Korea, Canada, Australia, Brazil); Work- and Organizational Psychology, Communication, Stress-Management, Audit Psychology - audit preparation of personnel, In-House Training & Lecturer for Quality Management.
1997:
Diploma in Chemistry (Dipl.-Chem.)
Free University (FU) Berlin, Germany
Grade: A
1998 ? 2001:
Doctorate in Physical Chemistry (Dr. rer. nat.)
Free University (FU) Berlin, Germany
[URL on request]
Grade: magna cum laude
2008 ? 2012:
Bachelor in Psychology (B.Sc.),
University of Hagen, Germany | extra-occupational
Full empirical study on Delay of Gratification and Procrastination, in English.
Grade: C (2.4)
2012 ? 2014:
Master in Psychology (M.SC)
University of Hagen, Germany | extra-occupational
Full empirical study on Test Anxiety, in English.
Grade: B (1.9)
10|2014 & 11|2014:
Advanced training on stress management ?train-the-trainer?
2015:
Training on ?Project Management - A Professional Training Course? (University Hagen)
Pharma & Medical Devices Project Management (Europe, USA, Japan)
Medical Devices, IVD & Pharma Project Management
(Europa, USA, Japan), Quality Management, GMP / GDP Guidelines and Legislation
(e.g., AMWHV, AMG, GDP 2013/C 343/01, EU-GMP Guideline, ICH Guidelines und
FDA/USA 21 CFR 4, 11, 210/211, 820; MEDDEV/MDCG, MPG/MPDG, MDR (EU) 2017/745,
IVDR (EU) 2017/746); Usability (Usability / Human Factors and Usability
Engineering acc. to IEC 62366 / FDA CDRH); DIN EN ISO 13485:2016; Audits /
Inspections; Regulatory Affairs Medical Devices (510(k), former STED Format ((n)IVDMAToC)
and Pharma (CMC Part ? Module 3 or Master Files for Combination Products /
Companion Products, Phyto-Pharmaceuticals, ATMP, ex-vivo GTMP), for registration
in e.g., Germany, Europe, USA, Japan, Korea, Canada, Australia, Brazil; Food
HACCP/GMP; CSV GAMP®5, 21CFR Part11; EU GMP Annex11; Work and Organizational
Psychology, Communication, Stress Management
Publications, organizations and author activities on request
Medical Devices, Pharmaceutical Industry