Automotive CAD Engineering ? Interior & Exterior Design, BiW
Aktualisiert am 02.06.2026
Profil
Freiberufler / Selbstständiger
Remote-Arbeit
Verfügbar ab: 01.07.2026
Verfügbar zu: 100%
davon vor Ort: 0%
CATIA
Siemens NX
3DEXPERIENCE
Automotive Engineering
Exterior Design
Plastic Parts Design
Body-in-White (BiW)
GSD (Generative Shape Design)
Aluminium Die Casting
Assembly Design
Interior Design
Part Design
Design for Manufacturing (DfM)
Assembly Analysis
Sheet Metal Design
Collision Analysis
STRAK / Studio Surface
BMW Design Standards
VW Group Standards
Daimler Design Standards
Porsche Design Standards
Polish
Muttersprache
English
B1

Einsatzorte

Einsatzorte

Deutschland, Österreich
möglich

Projekte

Projekte

5 years
2021-06 - now

various Projects

CAD Designer / Ad interim team leader
CAD Designer / Ad interim team leader

  • Acting as backup team leader: collaboration with all stakeholders and teamleading (AU38x, F7X, Lucid Gravity, Tesla Opal)
  • Direct collaboration with external team (as per business needs) (C-W17X)
  • Development of plastic parts (visible elements, surface design) - according tomanufacturability requirements and parametric requirements, based on STRAK(studio surface) data, BAP sections and customer specifications
  • Design modifications, installation and assembly analyzes
  • Technological solutions (demoulding, positioning, assembly and disassembly)
  • Investigations of the design space, collision investigations
  • Prepare presentations with technical suggestions, search for new technicalsolutions
  • Collaboration with enginering team, coordination of development of adjacent partsand assemblies
  • Training of CAD engineers
  • Managing a team of engineers
  • Direct contact with the client, supporting the client in meetings


Customer: Lucid Motors


Tasks:

  • Lucid Gravity ? center console, daschboard, door ? decors - construction based onstudio surface, update design, proposing and implementing solutions forproblematic areas, modifications according to client request, contact with kilent,backup team leader, implementing tool changes
  • ucid Gravity ? Trigger - Carrier, Shuttle - determination of directions anddemolding of parts, modifications according to client request, implementing toolchanges
  • ucid MidSize ? BiW - sheet metal elements and castings - Modifying the existingmodels, making changes, building new elements


Customer: Tesla


Tasks:

  • Opal ? center doors ? decors (cup holder area) - Reconstruction of the model onthe basis of dead files, technologicalization (making changes to enable production)in accordance with customer requirements, contact with the customer, backupteam leader, implementing tool changes
  • Opal ? Applique - Reconstruction of the model on the basis of dead files,technologicalization (making changes to enable production) in accordance withcustomer requirements, contact with the customer, project management,implementing tool changes.
  • Opal ? Carbon ? doors FR/RR/IP decor ? Reconstruction of the model on the basisof dead files, technologicalization (making changes to enable production) inaccordance with customer requirements, contact with the customer, projectmanagement, construction of tool models


Customer: Porshe


Tasks:

  • PO546 ? front seats and rear bench ? kinematic analysis, plastic and metalcomponents, construction based on studio surface, update design, proposing andimplementing solutions for problematic areas, runs of wires and reinforcing wiresin seat foams, modifications according to client request
  • PO K1 - front bumper ? AMG - construction based on STRAK - prototype phase


Customer: Audi


Tasks:

  • AU38x - center console - construction based on STRAK, update design, proposingand implementing solutions for problematic areas, modifications according toclient request - from beginning to serial production (car lift)


Customer: BMW


Tasks:

  • F7X - dashboard decors (right, left, center) - modifications according to clientrequest, update design, proposing and implementing solutions for problematicareas
  • G67 - Rear window roller blind - redesign, positioning and arrangement of rollers,cables, centering, investigations to increase the covered area by roller blind -prototype phase


Customer: Daimler


Tasks:

  • C-W17X ? front bumper ? AMG - construction based on STRAK - prototype phase


Customer: Rolls Royce


Tasks:

  • RR4x ? rear consol ? preparation of proposals for fixing solutions for thecustomer; construction based on STRAK - prototype phase
  • RR4x ? carrier RSE - Development of the monitor opening mechanism,solving assembly problems, packaging


Customer: Fisker


Tasks:

  • Pear ? Body in white - Modifying the existing model, making changes, buildingnew elements

various
5 years 6 months
2016-01 - 2021-06

Development of plastic parts

Cad Designer
Cad Designer
  • Development of plastic parts (visible elements, surface design) - according to manufacturability requirements and parametric requirements, based on STRAK data, BAP sections and customer specifications
  • Create the concept sections
  • Design modifications, installation and assembly analyzes
  • Development of kinematics and technological solutions (demoulding, positioning, assembly and disassembly)
  • Investigations of the design space, collision investigations
  • Prepare presentations with technical suggestions, search for new technical solutions
  • Collaboration with enginering team, coordination of development of adjacent parts and assemblies


Customer: Daimler


Tasks:

  • A177/A243/A177-E ? floor coverings - construction based on STRAK and BAP sections ? from beginning to serial production.
  • R190 - car trunk cover ? modifications according to client request
  • R190 ? strengthening the backrest of the car seat ? construction and technological design
  • C192/R232 ? section map floor coverings, car truk cover ? initial phase of car design
  • R232- rear floor (composite) - modifications according to client request - initial phase to series
  • W167 ? center console elements, armrest - construction based on STRAK, modifications according to client request ? final phase (series)
  • W206 ? C-pillar - construction based on STRAK concept phase
  • BR297 - front wall insulations - from beginning to serial production


Customer: BMW


Tasks:

  • F40 ? center console - modifications according to client request
  • G70 ? cover center console - construction based on STRAK from beginning to serial production
  • G2Y ? cup holder ? modifications according to client request
  • G2Y ? aluminium components - modifications according to client request, executive drawings
  • U06 ? rear panel clapboard - construction based on STRAK, modifications according to client request
  • I20 ? center console, armrest - construction based on STRAK, modifications according to client request ? initial phase
  • G60 ? dual core bezel, center consol ? initial phase
  • F7X ? aluminium decor - construction based on STRAK
  • G09 ? car door componets - construction based on STRAK and BAP sections ? from beginning to serial production
  • BMW ? gauges for rim components; testing devices for aluminium covers
  • Mini Cooper/BMW ? air cover on wheels; lid rims - construction based on STRAK from beginning to serial production, modifications according to client request


Customer: Porsche


Tasks:

  • PO 426 - air duct for cooling the brake discs ? mileage proposal - modifications according to client request
  • PO426 ? wheel arch - modifications according to client request
  • PO633 - floor coverings car trunk cover - construction based on STRAK, modifications according to client request
  • PO633 - engine hood insulation - construction based on STRAK from beginning to serial production
  • PO633 ? tailgate - modifications according to client request
  • PO633 ? water pipes, cables - waveform matching
  • PO633 ? front wall insulations - modifications according to client request
  • PO633 ? on- board tools - packaging
  • PO633 ? dashboard air vent cover - construction based on STRAK from and modifications according to client request,
  • PO633 ? middle tunnel insulation - modifications according to client request
  • loudspeaker cover aluminium - modifications according to client request, executive drawings


Customer: VW


Tasks:

  • VW416-2 - car door componets - construction based on STRAK ? concept phase
  • VW413 - dashboard elements - concept phase/interial phase - construction based on STRAK and BAP section vs


Customer: Ineos Granadier


Tasks:

  • Wheel carrier ? concept phase ? construction
  • Loading space - concept phase - construction based on STRAK


Customer: Audi


Tasks:

  • Audi ? design of aluminum (decorative) dashboard strips, speakers cover

various

Aus- und Weiterbildung

Aus- und Weiterbildung

2015

Automotive and Construction Machinery Enginnering

B.E

Warsaw University of Technology Faculty


Key Focus:

vehicle bodywork

Kompetenzen

Kompetenzen

Top-Skills

CATIA Siemens NX 3DEXPERIENCE Automotive Engineering Exterior Design Plastic Parts Design Body-in-White (BiW) GSD (Generative Shape Design) Aluminium Die Casting Assembly Design Interior Design Part Design Design for Manufacturing (DfM) Assembly Analysis Sheet Metal Design Collision Analysis STRAK / Studio Surface BMW Design Standards VW Group Standards Daimler Design Standards Porsche Design Standards

Produkte / Standards / Erfahrungen / Methoden

COMPETENCIES

Sectors? Knowledge

  • Automotive interior
  • automotive exterior


Skills

  • Design
  • concepts
  • kinematics


Materials, process

  • Injection molded parts
  • sheet metal
  • textilesaluminium die-cast


Products, parts

  • Center console
  • dashboard
  • car door
  • armrest
  • air duct
  • floor coverings
  • front wall insulations
  • isulation
  • BiW


CAD

  • CATIA V5
  • 3DEperience
  • Siemens NX
  • SolidWorks


Tools, procedures

  • Working VW Tools
  • Daimler design standards
  • BMW design standards
  • Porshe design standards
  • Lucis Motors
  • Rolls Royce
  • Tesla

Branchen

Branchen


Einsatzorte

Einsatzorte

Deutschland, Österreich
möglich

Projekte

Projekte

5 years
2021-06 - now

various Projects

CAD Designer / Ad interim team leader
CAD Designer / Ad interim team leader

  • Acting as backup team leader: collaboration with all stakeholders and teamleading (AU38x, F7X, Lucid Gravity, Tesla Opal)
  • Direct collaboration with external team (as per business needs) (C-W17X)
  • Development of plastic parts (visible elements, surface design) - according tomanufacturability requirements and parametric requirements, based on STRAK(studio surface) data, BAP sections and customer specifications
  • Design modifications, installation and assembly analyzes
  • Technological solutions (demoulding, positioning, assembly and disassembly)
  • Investigations of the design space, collision investigations
  • Prepare presentations with technical suggestions, search for new technicalsolutions
  • Collaboration with enginering team, coordination of development of adjacent partsand assemblies
  • Training of CAD engineers
  • Managing a team of engineers
  • Direct contact with the client, supporting the client in meetings


Customer: Lucid Motors


Tasks:

  • Lucid Gravity ? center console, daschboard, door ? decors - construction based onstudio surface, update design, proposing and implementing solutions forproblematic areas, modifications according to client request, contact with kilent,backup team leader, implementing tool changes
  • ucid Gravity ? Trigger - Carrier, Shuttle - determination of directions anddemolding of parts, modifications according to client request, implementing toolchanges
  • ucid MidSize ? BiW - sheet metal elements and castings - Modifying the existingmodels, making changes, building new elements


Customer: Tesla


Tasks:

  • Opal ? center doors ? decors (cup holder area) - Reconstruction of the model onthe basis of dead files, technologicalization (making changes to enable production)in accordance with customer requirements, contact with the customer, backupteam leader, implementing tool changes
  • Opal ? Applique - Reconstruction of the model on the basis of dead files,technologicalization (making changes to enable production) in accordance withcustomer requirements, contact with the customer, project management,implementing tool changes.
  • Opal ? Carbon ? doors FR/RR/IP decor ? Reconstruction of the model on the basisof dead files, technologicalization (making changes to enable production) inaccordance with customer requirements, contact with the customer, projectmanagement, construction of tool models


Customer: Porshe


Tasks:

  • PO546 ? front seats and rear bench ? kinematic analysis, plastic and metalcomponents, construction based on studio surface, update design, proposing andimplementing solutions for problematic areas, runs of wires and reinforcing wiresin seat foams, modifications according to client request
  • PO K1 - front bumper ? AMG - construction based on STRAK - prototype phase


Customer: Audi


Tasks:

  • AU38x - center console - construction based on STRAK, update design, proposingand implementing solutions for problematic areas, modifications according toclient request - from beginning to serial production (car lift)


Customer: BMW


Tasks:

  • F7X - dashboard decors (right, left, center) - modifications according to clientrequest, update design, proposing and implementing solutions for problematicareas
  • G67 - Rear window roller blind - redesign, positioning and arrangement of rollers,cables, centering, investigations to increase the covered area by roller blind -prototype phase


Customer: Daimler


Tasks:

  • C-W17X ? front bumper ? AMG - construction based on STRAK - prototype phase


Customer: Rolls Royce


Tasks:

  • RR4x ? rear consol ? preparation of proposals for fixing solutions for thecustomer; construction based on STRAK - prototype phase
  • RR4x ? carrier RSE - Development of the monitor opening mechanism,solving assembly problems, packaging


Customer: Fisker


Tasks:

  • Pear ? Body in white - Modifying the existing model, making changes, buildingnew elements

various
5 years 6 months
2016-01 - 2021-06

Development of plastic parts

Cad Designer
Cad Designer
  • Development of plastic parts (visible elements, surface design) - according to manufacturability requirements and parametric requirements, based on STRAK data, BAP sections and customer specifications
  • Create the concept sections
  • Design modifications, installation and assembly analyzes
  • Development of kinematics and technological solutions (demoulding, positioning, assembly and disassembly)
  • Investigations of the design space, collision investigations
  • Prepare presentations with technical suggestions, search for new technical solutions
  • Collaboration with enginering team, coordination of development of adjacent parts and assemblies


Customer: Daimler


Tasks:

  • A177/A243/A177-E ? floor coverings - construction based on STRAK and BAP sections ? from beginning to serial production.
  • R190 - car trunk cover ? modifications according to client request
  • R190 ? strengthening the backrest of the car seat ? construction and technological design
  • C192/R232 ? section map floor coverings, car truk cover ? initial phase of car design
  • R232- rear floor (composite) - modifications according to client request - initial phase to series
  • W167 ? center console elements, armrest - construction based on STRAK, modifications according to client request ? final phase (series)
  • W206 ? C-pillar - construction based on STRAK concept phase
  • BR297 - front wall insulations - from beginning to serial production


Customer: BMW


Tasks:

  • F40 ? center console - modifications according to client request
  • G70 ? cover center console - construction based on STRAK from beginning to serial production
  • G2Y ? cup holder ? modifications according to client request
  • G2Y ? aluminium components - modifications according to client request, executive drawings
  • U06 ? rear panel clapboard - construction based on STRAK, modifications according to client request
  • I20 ? center console, armrest - construction based on STRAK, modifications according to client request ? initial phase
  • G60 ? dual core bezel, center consol ? initial phase
  • F7X ? aluminium decor - construction based on STRAK
  • G09 ? car door componets - construction based on STRAK and BAP sections ? from beginning to serial production
  • BMW ? gauges for rim components; testing devices for aluminium covers
  • Mini Cooper/BMW ? air cover on wheels; lid rims - construction based on STRAK from beginning to serial production, modifications according to client request


Customer: Porsche


Tasks:

  • PO 426 - air duct for cooling the brake discs ? mileage proposal - modifications according to client request
  • PO426 ? wheel arch - modifications according to client request
  • PO633 - floor coverings car trunk cover - construction based on STRAK, modifications according to client request
  • PO633 - engine hood insulation - construction based on STRAK from beginning to serial production
  • PO633 ? tailgate - modifications according to client request
  • PO633 ? water pipes, cables - waveform matching
  • PO633 ? front wall insulations - modifications according to client request
  • PO633 ? on- board tools - packaging
  • PO633 ? dashboard air vent cover - construction based on STRAK from and modifications according to client request,
  • PO633 ? middle tunnel insulation - modifications according to client request
  • loudspeaker cover aluminium - modifications according to client request, executive drawings


Customer: VW


Tasks:

  • VW416-2 - car door componets - construction based on STRAK ? concept phase
  • VW413 - dashboard elements - concept phase/interial phase - construction based on STRAK and BAP section vs


Customer: Ineos Granadier


Tasks:

  • Wheel carrier ? concept phase ? construction
  • Loading space - concept phase - construction based on STRAK


Customer: Audi


Tasks:

  • Audi ? design of aluminum (decorative) dashboard strips, speakers cover

various

Aus- und Weiterbildung

Aus- und Weiterbildung

2015

Automotive and Construction Machinery Enginnering

B.E

Warsaw University of Technology Faculty


Key Focus:

vehicle bodywork

Kompetenzen

Kompetenzen

Top-Skills

CATIA Siemens NX 3DEXPERIENCE Automotive Engineering Exterior Design Plastic Parts Design Body-in-White (BiW) GSD (Generative Shape Design) Aluminium Die Casting Assembly Design Interior Design Part Design Design for Manufacturing (DfM) Assembly Analysis Sheet Metal Design Collision Analysis STRAK / Studio Surface BMW Design Standards VW Group Standards Daimler Design Standards Porsche Design Standards

Produkte / Standards / Erfahrungen / Methoden

COMPETENCIES

Sectors? Knowledge

  • Automotive interior
  • automotive exterior


Skills

  • Design
  • concepts
  • kinematics


Materials, process

  • Injection molded parts
  • sheet metal
  • textilesaluminium die-cast


Products, parts

  • Center console
  • dashboard
  • car door
  • armrest
  • air duct
  • floor coverings
  • front wall insulations
  • isulation
  • BiW


CAD

  • CATIA V5
  • 3DEperience
  • Siemens NX
  • SolidWorks


Tools, procedures

  • Working VW Tools
  • Daimler design standards
  • BMW design standards
  • Porshe design standards
  • Lucis Motors
  • Rolls Royce
  • Tesla

Branchen

Branchen


Vertrauen Sie auf Randstad

Im Bereich Freelancing
Im Bereich Arbeitnehmerüberlassung / Personalvermittlung

Fragen?

Rufen Sie uns an +49 89 500316-300 oder schreiben Sie uns:

Das Freelancer-Portal

Direktester geht's nicht! Ganz einfach Freelancer finden und direkt Kontakt aufnehmen.