Technical project management, automotive hardware development and verification
Aktualisiert am 07.02.2025
Profil
Freiberufler / Selbstständiger
Verfügbar ab: 01.04.2025
Verfügbar zu: 100%
davon vor Ort: 100%
Englisch
fließend
Französisch
Grundkenntnisse

Einsatzorte

Einsatzorte

Oldenburg in Oldenburg (+300km)
Deutschland
nicht möglich

Projekte

Projekte

7 Monate
2018-06 - 2018-12

Process definition and reorganisation of automotive navigation requirements

Requirements and process definition Project Coordination process analysis Requirements Analysis
Requirements and process definition
  • Analysis of existing requirements and change request process and structure
  • Definition of and agreements upon the target processes
  • Time schedule and milestone planning
  • Setting up the new requirements structure
  • Training on the new structure for the function owners
DOORS MS Powerpoint MS Project MS Word MS Excel
Project Coordination process analysis Requirements Analysis
Wolfsburg
1 Jahr 1 Monat
2017-03 - 2018-03

Technical Project Manager Automotive Display Rfq

Technical project management and coordination Project Coordination Requirements Analysis DOORS
Technical project management and coordination
  • Customer communication and negotiations with OEM
  • International development team coordination (Japan, Germany)
  • Requirements analysis and tracking
  • Offer planning and coordination
DOORS Redmine Excel MS Project MS Powerpoint
Project Coordination Requirements Analysis DOORS
Alpine Electronics GmbH
Munich
9 Monate
2016-05 - 2017-01

Coordination of Circuit Design For Climate Control Units on Automotive Large-Volume Production

Technical coordination electronic hardware development Worst Case Analysis FMEA KPI ...
Technical coordination electronic hardware development
  • Coordination of work tasks in the development team (India, USA, Germany)
  • Technical approval of circuit design, FMEA and worst case calculation
  • Modularization of the hardware development process
  • Definition of electrical circuit modules and variants
  • Savings on process, circuit modules and component variations
  • Lessons learned
  • Documentation
MS Project DOORS Excel MS Powerpoint
Worst Case Analysis FMEA KPI Project Coordination
BHTC Behr-Hella Thermocontrol GmbH
Lippstadt
3 Jahre 7 Monate
2012-10 - 2016-04

System Development For Asia Car Navigation Systems

Technical projekt management and specification Project Coordination DOORS
Technical projekt management and specification
  • Technical function responsibility
  • Asian and German supplier coordination during the development process
  • Coordination of Asian and German test teams for verification in lab and field.
  • System requirement specification
  • Country specific requirements adaption
  • Approvals on target specification
  • System qualification
  • Fault analysis and containment action during development process
  • Fault management
  • Technical system approval
Fehlermanagementsystem (kundenspezifisch) Excel DOORS MS Project MS Powerpoint
Project Coordination DOORS
Volkswagen AG
Wolfsburg
5 Jahre
2007-10 - 2012-09

System Development For EU And U.S. Car Navigation Systems

Technical function responsibility Requirement Engineer Acceptance Test
Technical function responsibility
  • Technical function responsibility
  • US and German supplier coordination during the development process
  • System requirement specification
  • Country specific requirements adaption
  • Approvals on target specification
  • International test coordination and verification in lab and field tests
  • System qualification
  • Fault analysis and containment action definition on development process
  • Fault management
  • Technical system approval
  • Fault management during mass production
Fehlermanagementsystem (kundenspezifisch) Excel MS Project
Requirement Engineer Acceptance Test
Audi AG
Ingolstadt
1 Jahr 3 Monate
2006-07 - 2007-09

HW Development of Climate Control Units For Automotive Large-Volume Production

Electronics hardware developer Analogue and digital circuit design EMC
Electronics hardware developer
  • Circuit development
  • Failure mode and effect analysis (FMEA)
  • Worst case calculation
  • Testability
  • EMC improvement
  • Layout tracking and verification
  • Test and commissioning
  • Savings
  • Circuit qualification
  • Documentation
  • Modularization of the hardware development process
Mentor Graphics Expedition D-FMEA MS Office
Analogue and digital circuit design EMC
BHTC Behr-Hella Thermocontrol GmbH
Lippstadt
2 Jahre 8 Monate
2003-11 - 2006-06

Functional Increase And Hardware Upgrades For Car Navigation Systems

Electronics hardware developer, technical function responsible Hardware Developement EMC Validation ...
Electronics hardware developer, technical function responsible
  • Hardware requirement specification
  • Hardware qualification
  • EMC test and definition of improvements
  • Temperature improvements
  • Fault analysis
  • Data base update strategies
  • Software, diagnosis and system specification increase
  • Functional and diagnosis requirement specifications
  • System verification and test (incl. planning) with US and German test teams
  • Data base update testing
  • Fault management during mass production
MS Office
Hardware Developement EMC Validation Acceptance test
Audi AG
Ingolstadt
11 Monate
2003-01 - 2003-11

Development of a Semi Intelligent Instrument Cluster

Electronics hardware developer Hardware Developement
Electronics hardware developer
  • Sensor signal analysis and circuit adaption
  • Error analysis
  • Circuit validation analog and digital
  • Savings
  • Module qualification
  • Documentation
Hardware Developement
Siemens VDO Automotive AG
Regensburg
1 Jahr 8 Monate
2001-05 - 2002-12

Hardware Development And Improvement of Car Navigation Systems

Electronics hardware developer Hardware Developement
Electronics hardware developer
  • Error analysis
  • Board test strategy definition
  • EMC test and improvement
  • Circuit improvement
  • Layout tracking and verification
  • Tests und commissioning
  • Savings
  • Device qualification
  • Documentation
Hardware Developement
Innovative Systems / Harman/Becker GmbH
Hamburg
1 Jahr 7 Monate
1999-11 - 2001-05

Development of a Multimedia Main Unit With PCI And MOST Interfaces

Electronics hardware developer Hardware Developement
Electronics hardware developer
  • Circuit design µC, bus systems, memory, video and peripheral interfaces
  • Verification and requirement relevant improvement of µC chip design
  • Layout tracking and verification
  • EMC test and improvement
  • Test and qualification of circuit and bus systems
Hardware Developement
Siemens Automobiltechnik AG
Regensburg
8 Monate
2000-09 - 2001-04

Development of a cPCI Board Test Adaptor For µC Applications

Electronics hardware developer Hardware Developement
Electronics hardware developer
  • System and test specification
  • Circuit design, connectivity, tester adapting, HW driver
  • Circuit, PCB and system verification
  • Layout
  • Documentation
  • Assembly supervision
Excel MS Powerpoint EAGLE
Hardware Developement
Sarstedt
1 Jahr 2 Monate
1998-10 - 1999-11

Development of a Radio/TV PC CompactPCI Card For DAB/DMB

Electronics hardware developer Hardware Developement EMC Acceptance Test ...
Electronics hardware developer
  • Sub-project management
  • Test strategies
  • Circuit design µC, cPCI, memory, glue logic
  • EPLD programming
  • EMC test and improvement
  • Layout verification
  • Tests und commissioning
  • Low level driver programming
  • Project tracking until start of mass production
Hardware Developement EMC Acceptance Test Assembler
Robert Bosch Multimedia GmbH
Hildesheim
1 Jahr 5 Monate
1997-06 - 1998-10

Development of a Vandalism Protected LC Display For Public Transportation

Hardware developer EMC Acceptance Test
Hardware developer
  • Sub-project management
  • Case design, mounting instructions
  • Definition of vandalism protection appliance
  • EMC improvement
  • Tracking of development and production process
  • Tests und commissioning
  • Documentation
EMC Acceptance Test
Robert Bosch Multimedia GmbH
Hildesheim
3 Monate
1998-04 - 1998-06

Optimization of a GPS Receiver (Navigation Module) in a DMB µC System For Public Transportation

Hardware developer Hardware Developement Acceptance Test
Hardware developer
  • Fault analysis
  • Circuit redesign
  • Software adaption for the DSP
  • Tests und commissioning
Hardware Developement Acceptance Test
Robert Bosch Multimedia GmbH
Hildesheim
1 Jahr 10 Monate
1996-05 - 1998-02

Development of a Passenger Information System For Public Transportation Based on DAB / DMB

Hardware developer Hardware Developement EMC
Hardware developer
  • Customer requirements clarification
  • Analysis of visual appearance
  • Technical target specification
  • Circuit design (µC, memory interfaces, decoder chips)
  • Layout verification
  • EMC improvement
  • EPLD and Flex programming (AHDL)
  • Application specific DSP programming (Assembler)
  • Tests und commissioning
  • Bill of materials and Documentation
  • Project supervision until start of production
  • Extension of the functional requirements
Hardware Developement EMC
Robert Bosch Multimedia GmbH
Hildesheim
6 Monate
1997-01 - 1997-06

Development of an Audio Distribution Module For Public Transportation

Hardware developer Hardware Developement EMC Acceptance Test
Hardware developer
  • Technical specification
  • Circuit design analog and digital
  • Casing modification
  • Layout and casing test and verification
  • EMC measurement and improvement
  • Device test and commissioning
  • Project supervision until start of pre-production
Hardware Developement EMC Acceptance Test
Blaupunkt GmbH
Hildesheim

Aus- und Weiterbildung

Aus- und Weiterbildung

Januar 1996

Abschluss als Diplom-Ingenieur Elektrotechnik

Studium der Elektrotechnik an der Technischen Universität Braunschweig, Studienschwerpunkt Messtechnik
Diplomarbeitsthema:

Entwicklung, Aufbau und Programmierung eines anpassungsfähigen Gehörtrainers für die Musikausbildung

Position

Position

Technical project manager and electronics hardware developer for automotive infotainmenment devices.

Kompetenzen

Kompetenzen

Schwerpunkte

  • Technische Fachprojektbetreuung
  • Spezifikationserstellung und -abstimmung (Lastenheft / Pflichtenheft)
  • Entwicklungsbegleitende Koordination und Kontrolle
  • Validierung und Verifikation
  • Feldbetreuung und Maintenance von Gesamtsystemen
  • Systemanalyse, -design und -verifikation im Automotiveumfeld (embedded systems, Car-μC)
  • Hardwareentwicklung digital, mixed-signal, NF, NF-Audio
  • EMV-gerechtes Schaltungs- und Leiterkartendesign
  • EMV Test und Optimierung
  • Hardwaretest und -inbetriebnahme
  • Gerätequalifikation

Aufgabenbereiche

Hardware Development
Project Coordination
Requirements Analysis

Produkte / Standards / Erfahrungen / Methoden

Acceptance test
Analogue and digital circuit design
D-FMEA
DOORS
DOORS
EMC
Excel
Fehlermanagementsystem (kundenspezifisch)
FMEA
Hardware Developement
KPI
Mentor Graphics Expedition
MS Excel
MS Office
MS Powerpoint
MS Project
MS Word
process analysis
Redmine
Requirement Analysis
Requirement Engineer
Validation

Werkzeuge

  • Doors
  • iqFMEA
  • Micrografx ABC FlowCharter
  • MS Excel, Powerpoint, Word
  • MS Project
  • MS Visio
  • Kundenspezifische Fehlermanagementprogramme
  • Eagle
  • Orcad SDT/PCB
  • Mentor Graphics (Grundkentnisse)
  • Silent
  • Emulatoren: Motorola, Texas Instruments, Tasking

Bussysteme

  • CAN
  • I2C
  • I2S
  • LIN
  • MOST
  • PCI 2.0 / cPCI
  • RS232

Programmiersprachen

Assembler
  • AHDL
  • Assembler: 80x86, 8051, 80535, Motorola56166
  • C (Grundkenntnisse)

Berechnung / Simulation / Versuch / Validierung

Silence
Worst Case Analysis

Design / Entwicklung / Konstruktion

EAGLE
Mentor Graphics

Branchen

Branchen

  • Automotive
  • Public Transportation
  • Public Broadcasting
  • Electronic Development

Einsatzorte

Einsatzorte

Oldenburg in Oldenburg (+300km)
Deutschland
nicht möglich

Projekte

Projekte

7 Monate
2018-06 - 2018-12

Process definition and reorganisation of automotive navigation requirements

Requirements and process definition Project Coordination process analysis Requirements Analysis
Requirements and process definition
  • Analysis of existing requirements and change request process and structure
  • Definition of and agreements upon the target processes
  • Time schedule and milestone planning
  • Setting up the new requirements structure
  • Training on the new structure for the function owners
DOORS MS Powerpoint MS Project MS Word MS Excel
Project Coordination process analysis Requirements Analysis
Wolfsburg
1 Jahr 1 Monat
2017-03 - 2018-03

Technical Project Manager Automotive Display Rfq

Technical project management and coordination Project Coordination Requirements Analysis DOORS
Technical project management and coordination
  • Customer communication and negotiations with OEM
  • International development team coordination (Japan, Germany)
  • Requirements analysis and tracking
  • Offer planning and coordination
DOORS Redmine Excel MS Project MS Powerpoint
Project Coordination Requirements Analysis DOORS
Alpine Electronics GmbH
Munich
9 Monate
2016-05 - 2017-01

Coordination of Circuit Design For Climate Control Units on Automotive Large-Volume Production

Technical coordination electronic hardware development Worst Case Analysis FMEA KPI ...
Technical coordination electronic hardware development
  • Coordination of work tasks in the development team (India, USA, Germany)
  • Technical approval of circuit design, FMEA and worst case calculation
  • Modularization of the hardware development process
  • Definition of electrical circuit modules and variants
  • Savings on process, circuit modules and component variations
  • Lessons learned
  • Documentation
MS Project DOORS Excel MS Powerpoint
Worst Case Analysis FMEA KPI Project Coordination
BHTC Behr-Hella Thermocontrol GmbH
Lippstadt
3 Jahre 7 Monate
2012-10 - 2016-04

System Development For Asia Car Navigation Systems

Technical projekt management and specification Project Coordination DOORS
Technical projekt management and specification
  • Technical function responsibility
  • Asian and German supplier coordination during the development process
  • Coordination of Asian and German test teams for verification in lab and field.
  • System requirement specification
  • Country specific requirements adaption
  • Approvals on target specification
  • System qualification
  • Fault analysis and containment action during development process
  • Fault management
  • Technical system approval
Fehlermanagementsystem (kundenspezifisch) Excel DOORS MS Project MS Powerpoint
Project Coordination DOORS
Volkswagen AG
Wolfsburg
5 Jahre
2007-10 - 2012-09

System Development For EU And U.S. Car Navigation Systems

Technical function responsibility Requirement Engineer Acceptance Test
Technical function responsibility
  • Technical function responsibility
  • US and German supplier coordination during the development process
  • System requirement specification
  • Country specific requirements adaption
  • Approvals on target specification
  • International test coordination and verification in lab and field tests
  • System qualification
  • Fault analysis and containment action definition on development process
  • Fault management
  • Technical system approval
  • Fault management during mass production
Fehlermanagementsystem (kundenspezifisch) Excel MS Project
Requirement Engineer Acceptance Test
Audi AG
Ingolstadt
1 Jahr 3 Monate
2006-07 - 2007-09

HW Development of Climate Control Units For Automotive Large-Volume Production

Electronics hardware developer Analogue and digital circuit design EMC
Electronics hardware developer
  • Circuit development
  • Failure mode and effect analysis (FMEA)
  • Worst case calculation
  • Testability
  • EMC improvement
  • Layout tracking and verification
  • Test and commissioning
  • Savings
  • Circuit qualification
  • Documentation
  • Modularization of the hardware development process
Mentor Graphics Expedition D-FMEA MS Office
Analogue and digital circuit design EMC
BHTC Behr-Hella Thermocontrol GmbH
Lippstadt
2 Jahre 8 Monate
2003-11 - 2006-06

Functional Increase And Hardware Upgrades For Car Navigation Systems

Electronics hardware developer, technical function responsible Hardware Developement EMC Validation ...
Electronics hardware developer, technical function responsible
  • Hardware requirement specification
  • Hardware qualification
  • EMC test and definition of improvements
  • Temperature improvements
  • Fault analysis
  • Data base update strategies
  • Software, diagnosis and system specification increase
  • Functional and diagnosis requirement specifications
  • System verification and test (incl. planning) with US and German test teams
  • Data base update testing
  • Fault management during mass production
MS Office
Hardware Developement EMC Validation Acceptance test
Audi AG
Ingolstadt
11 Monate
2003-01 - 2003-11

Development of a Semi Intelligent Instrument Cluster

Electronics hardware developer Hardware Developement
Electronics hardware developer
  • Sensor signal analysis and circuit adaption
  • Error analysis
  • Circuit validation analog and digital
  • Savings
  • Module qualification
  • Documentation
Hardware Developement
Siemens VDO Automotive AG
Regensburg
1 Jahr 8 Monate
2001-05 - 2002-12

Hardware Development And Improvement of Car Navigation Systems

Electronics hardware developer Hardware Developement
Electronics hardware developer
  • Error analysis
  • Board test strategy definition
  • EMC test and improvement
  • Circuit improvement
  • Layout tracking and verification
  • Tests und commissioning
  • Savings
  • Device qualification
  • Documentation
Hardware Developement
Innovative Systems / Harman/Becker GmbH
Hamburg
1 Jahr 7 Monate
1999-11 - 2001-05

Development of a Multimedia Main Unit With PCI And MOST Interfaces

Electronics hardware developer Hardware Developement
Electronics hardware developer
  • Circuit design µC, bus systems, memory, video and peripheral interfaces
  • Verification and requirement relevant improvement of µC chip design
  • Layout tracking and verification
  • EMC test and improvement
  • Test and qualification of circuit and bus systems
Hardware Developement
Siemens Automobiltechnik AG
Regensburg
8 Monate
2000-09 - 2001-04

Development of a cPCI Board Test Adaptor For µC Applications

Electronics hardware developer Hardware Developement
Electronics hardware developer
  • System and test specification
  • Circuit design, connectivity, tester adapting, HW driver
  • Circuit, PCB and system verification
  • Layout
  • Documentation
  • Assembly supervision
Excel MS Powerpoint EAGLE
Hardware Developement
Sarstedt
1 Jahr 2 Monate
1998-10 - 1999-11

Development of a Radio/TV PC CompactPCI Card For DAB/DMB

Electronics hardware developer Hardware Developement EMC Acceptance Test ...
Electronics hardware developer
  • Sub-project management
  • Test strategies
  • Circuit design µC, cPCI, memory, glue logic
  • EPLD programming
  • EMC test and improvement
  • Layout verification
  • Tests und commissioning
  • Low level driver programming
  • Project tracking until start of mass production
Hardware Developement EMC Acceptance Test Assembler
Robert Bosch Multimedia GmbH
Hildesheim
1 Jahr 5 Monate
1997-06 - 1998-10

Development of a Vandalism Protected LC Display For Public Transportation

Hardware developer EMC Acceptance Test
Hardware developer
  • Sub-project management
  • Case design, mounting instructions
  • Definition of vandalism protection appliance
  • EMC improvement
  • Tracking of development and production process
  • Tests und commissioning
  • Documentation
EMC Acceptance Test
Robert Bosch Multimedia GmbH
Hildesheim
3 Monate
1998-04 - 1998-06

Optimization of a GPS Receiver (Navigation Module) in a DMB µC System For Public Transportation

Hardware developer Hardware Developement Acceptance Test
Hardware developer
  • Fault analysis
  • Circuit redesign
  • Software adaption for the DSP
  • Tests und commissioning
Hardware Developement Acceptance Test
Robert Bosch Multimedia GmbH
Hildesheim
1 Jahr 10 Monate
1996-05 - 1998-02

Development of a Passenger Information System For Public Transportation Based on DAB / DMB

Hardware developer Hardware Developement EMC
Hardware developer
  • Customer requirements clarification
  • Analysis of visual appearance
  • Technical target specification
  • Circuit design (µC, memory interfaces, decoder chips)
  • Layout verification
  • EMC improvement
  • EPLD and Flex programming (AHDL)
  • Application specific DSP programming (Assembler)
  • Tests und commissioning
  • Bill of materials and Documentation
  • Project supervision until start of production
  • Extension of the functional requirements
Hardware Developement EMC
Robert Bosch Multimedia GmbH
Hildesheim
6 Monate
1997-01 - 1997-06

Development of an Audio Distribution Module For Public Transportation

Hardware developer Hardware Developement EMC Acceptance Test
Hardware developer
  • Technical specification
  • Circuit design analog and digital
  • Casing modification
  • Layout and casing test and verification
  • EMC measurement and improvement
  • Device test and commissioning
  • Project supervision until start of pre-production
Hardware Developement EMC Acceptance Test
Blaupunkt GmbH
Hildesheim

Aus- und Weiterbildung

Aus- und Weiterbildung

Januar 1996

Abschluss als Diplom-Ingenieur Elektrotechnik

Studium der Elektrotechnik an der Technischen Universität Braunschweig, Studienschwerpunkt Messtechnik
Diplomarbeitsthema:

Entwicklung, Aufbau und Programmierung eines anpassungsfähigen Gehörtrainers für die Musikausbildung

Position

Position

Technical project manager and electronics hardware developer for automotive infotainmenment devices.

Kompetenzen

Kompetenzen

Schwerpunkte

  • Technische Fachprojektbetreuung
  • Spezifikationserstellung und -abstimmung (Lastenheft / Pflichtenheft)
  • Entwicklungsbegleitende Koordination und Kontrolle
  • Validierung und Verifikation
  • Feldbetreuung und Maintenance von Gesamtsystemen
  • Systemanalyse, -design und -verifikation im Automotiveumfeld (embedded systems, Car-μC)
  • Hardwareentwicklung digital, mixed-signal, NF, NF-Audio
  • EMV-gerechtes Schaltungs- und Leiterkartendesign
  • EMV Test und Optimierung
  • Hardwaretest und -inbetriebnahme
  • Gerätequalifikation

Aufgabenbereiche

Hardware Development
Project Coordination
Requirements Analysis

Produkte / Standards / Erfahrungen / Methoden

Acceptance test
Analogue and digital circuit design
D-FMEA
DOORS
DOORS
EMC
Excel
Fehlermanagementsystem (kundenspezifisch)
FMEA
Hardware Developement
KPI
Mentor Graphics Expedition
MS Excel
MS Office
MS Powerpoint
MS Project
MS Word
process analysis
Redmine
Requirement Analysis
Requirement Engineer
Validation

Werkzeuge

  • Doors
  • iqFMEA
  • Micrografx ABC FlowCharter
  • MS Excel, Powerpoint, Word
  • MS Project
  • MS Visio
  • Kundenspezifische Fehlermanagementprogramme
  • Eagle
  • Orcad SDT/PCB
  • Mentor Graphics (Grundkentnisse)
  • Silent
  • Emulatoren: Motorola, Texas Instruments, Tasking

Bussysteme

  • CAN
  • I2C
  • I2S
  • LIN
  • MOST
  • PCI 2.0 / cPCI
  • RS232

Programmiersprachen

Assembler
  • AHDL
  • Assembler: 80x86, 8051, 80535, Motorola56166
  • C (Grundkenntnisse)

Berechnung / Simulation / Versuch / Validierung

Silence
Worst Case Analysis

Design / Entwicklung / Konstruktion

EAGLE
Mentor Graphics

Branchen

Branchen

  • Automotive
  • Public Transportation
  • Public Broadcasting
  • Electronic Development

Vertrauen Sie auf Randstad

Im Bereich Freelancing
Im Bereich Arbeitnehmerüberlassung / Personalvermittlung

Fragen?

Rufen Sie uns an +49 89 500316-300 oder schreiben Sie uns:

Das Freelancer-Portal

Direktester geht's nicht! Ganz einfach Freelancer finden und direkt Kontakt aufnehmen.