SAP-Berater Logistik /SCM: SRM, MM, LE/WM, EWM, S/4 HANA, PP, Retail, QM-- sehr gute Erfahrung -- Template Aufbau und Roll Out
Aktualisiert am 13.01.2022
Profil
Freiberufler / Selbstständiger
Verfügbar ab: 01.03.2022
Verfügbar zu: 100%
davon vor Ort: 100%
Deutsch
verhandlungssicher
Englisch
verhandlungssicher
Türkisch
Muttersprache

Einsatzorte

Einsatzorte

Deutschland, Österreich, Schweiz

Weitere Länder: China, Hongkong, Japan, Korea (Nord), Korea (Süd), Macao, Mongolei, Taiwan

nicht möglich

Projekte

Projekte

7 Monate
2021-01 - 2021-07

MM / EWM - SAP S/4HANA implemantation

Senior consultant ? MM / EWM/ S/4 HANA
Senior consultant ? MM / EWM/ S/4 HANA

  • Organizational Structure for Production Supply defined
  • Setting Up the Integration to Production
  • Defined the Production Supply Area
  • Maintained PSA Table
  • Executing the Picks for Production
  • Goods Issue and Backflushing
  • Planned and Unplanned Replenishment
  • Order-Related Replenishment
  • Direct Replenishment
  • Automatic Replenishment
  • Rearrangement
  • Ad Hoc Warehouse Tasks
  • Posting Changes
  • Process-oriented storage control (POSC)
  • Layout-oriented storage control (LOSC)
  • Prepared decision document for EWM Integration into the SAP landscape
  • Picking and packing process 
  • Define and Parametrization Storage Types
  • Define strategy for GR and GI process
  • Define new Warehouse Process Type
  • Defined master data for cut over
  • Troubleshooting and problem-solving during migration projects

Zürich (Switzerland)
1 Jahr 4 Monate
2019-09 - 2020-12

eWM - MM ? S/4 HANA Roll Out Template/ Agile method Best Practice

Senior consultant ? MM / EWM/ S/4 HANA
Senior consultant ? MM / EWM/ S/4 HANA

  • Prepared decision document for EWM Integration into the SAP landscape
  • Inbound process described and realized
  • Outbound process described and realized
  • PMR process described and realized
  • Picking and packing process described customized
  • Set up EWM connection with EWM
  • Set up the organization structure for IM and EWM
  • Defined and described the warehouse structure
  • Set up the customizing documentation and described the setting
  • Defined the stock type
  • Described Business concept for eWM / IM
  • Set up the technical setting eWM and LE (General setting)
  • Set up the integration eWM and ERP
  • Conducted the delivery processing / Setting
  • Define and described master data (Storage type, Storage section, Storage bin, Storage Area, Activity are ?etc) in EWM
  • PSA process described and integration between EWM and PP
  • Define Warehouse document type
  • Define and Parametrization Storage Types
  • Prepare and conducted several Workshop 
  • HU ? Process described and realized
  • Defined the HU structure
  • A packaging material is created described for HU process
  • Goods receipt and Goods Issue process described and customized and documented.
  • Define strategy for GR and GI process
  • Described and realized Goods Issue Process
  1. Wave management process
  2. Picking process
  3. Outbound delivery
  4. Delivery process
  • Prepared and care out the proto type
  • Serial number management process described and realized in IM and EWM
  • Stock Transfers and Posting Changes
  • Batch Management process described and realized in IM / EWM
  • Product Transfer process in EWM described and realized
  • Defined master data for cut over

Vaillant Remscheid
Remscheid (Germany)
8 Monate
2019-01 - 2019-08

eWM - MM ? S/4 HANA Roll Out Template

Senior consultant ? MM / EWM/ S/4 HANA
Senior consultant ? MM / EWM/ S/4 HANA

  • Described Purchase process (PR/PO and contract) and set up the customizing setting
  • Described and set up the Inter company process
  • Described the IM Structure and set up the customizing
  • Described Business concept for eWM
  • Defined and created organization structure for EWM
  • Determine Storage Type Search Sequence for Stock Removal
  • Prepare Workshop and conducted
  • GR Inbound delivery process
  • GI Outbound delivery process
  • Define strategy for GR and GI process
  • Wave management process
  • Picking process
  • Analyzed and reviewed existing concepts
  • Prepared and conducted several workshop
  • Prepared and care out the prototype
  • Set up Master data in ERP / EWM
  • Serialization and Butch management
  • Ware house Order / Ware house Task Process
  • STO process describe and set up the customizing in EWM and S4/HANA
  • Product supply integration

RECARO/ Swiss Krono
Schwäbisch Hall (Germany)
8 Monate
2019-01 - 2019-08

eWM - MM ? S/4 HANA Roll Out

Senior consultant ? MM / EWM/ S/4 HANA
Senior consultant ? MM / EWM/ S/4 HANA

  • Described Business concept for eWM
  • Defined and created organization structure for EWM / IM
  • Process-Oriented Storage Control for Inbound Processes (POSC)
  • Layout Oriented Storage Control (LOSC)
  • Set up the customizing in EWM and ERP
  • Determine Storage Type Search Sequence for Stock Removal
  • HU and Packaging process Implemented
  • Packaging Specification describe, customizing and created
  • Described and realized the Goods Receipt Process (Inbound)
  • Described and realized the Goods issue Process (out bound)
  • Define and describe Storage type
  • Set up the setting for Storage type, regarding customer requirement
  • Define strategy for GR and GI process
  • Described and Sep up Internal Warehouse process
  • Define material Staging Area
  • Warehouse Task and Order Process
  • Prepared the test case (Unit, Functional and integration test)
  • Analyzed and reviewed existing concepts
  • Prepared and conducted several work shop
  • Prepared and care out the proto type
  • Set up Master data at for eWM
  1. defined storage type
  2. Define Storage Section
  3. Staging Areas
  4. Ware house Order /  Ware house Task
  5. Wave
  6. WAS Process
  7. Serial number process in EWM
  • Set up Master data in eWM / IM
  • Physical Inventory process

V-ZUG
Zürich (Switzerland)
6 Monate
2018-07 - 2018-12

eWM - MM ? QM- S/4 HANA Roll Out and new Implementation/ Based on Model Companys MNC and Automotive

Senior consultant ?/ MM - PtP / S/4 HANA
Senior consultant ?/ MM - PtP / S/4 HANA

  • Described Business concept for eWM
  • Defined and created organization structure for EWM
  • Determine Storage Type Search Sequence for Stock Removal
  • Putaway process with strategy
  • Stock removal process with strategy
  • Outbound and Bound Process review extended
  • Handling Unit Implementation (HU) / packaging process
  • Set up organization unit and Structure for EWM and IM
  • Described and realized the Goods Receipt Process
  • Described and realized Goods Issue Process
  • Wave, Picking
  • Described and Sep up Internal Warehouse process
  • Warehouse Task and Order Process
  • Prepared the test case (Unit, Functional and integration test)
  • Analyzed and reviewed existing concepts
  • Prepared and conducted several work shop
  • Prepared and care out the proto type
  • Set up Master data at for eWM
  1. defined storage type
  2. Define Storage Section
  3. Staging Areas
  4. Ware house Order
  5. Ware house Task
  6. Serialnumbern process in EWM /S4/HANA (Embedded)
  • Data Migration
  • Cutover plan

ODELO/ Automotive
Stuttgart (Germany)
1 Jahr 1 Monat
2017-07 - 2018-07

eWM - MM - S/4 HANA Roll Out and new Implementation

Senior consultant ? WM / EWM / MM / S/4 HANA
Senior consultant ? WM / EWM / MM / S/4 HANA

Role/Skill/Task:

  • Described several Business concept for eWM
  • Specified, described and analyzed several GAPs and technical documents
  • SAP EWM Configuration incl. test, documentation and validation 
  • Set up organization unit and Structure for EWM
  • Define the process flow in eWM
  • Data transfer between ERP and EWM / Core Interface (CIF)
  • Described and realized the Goods Receipt Process
    • Inbound delivery
    • Expected Goods Receipt process and
    • Define strategy
  • Described and realized Goods Issue Process
    • Wave management process
    • Picking process
    • Outbound delivery
    • Delivery process
  • Described and Sep up Internal Warehouse process
  • Storage control
  • Define material Staging Area
  • Warehouse Task and Order Process
  • Replenishment process
  • Prepared the test case (Unit, Functional and integration test)
  • Created and prepared the test cases.
  • Analyzed and reviewed existing concepts
  • Prepared the scenario and conducted the test case
  • Prepared and conducted several work shop
  • Prepared and care out the proto type
  • Set up Master data at for eWM/ IM
    • defined storage type
    • Define Storage Section
    • Staging Areas
    • Ware house Order
    • Ware house Task
    • Stock determination
Solar AG
Germany, Dänemark
1 Jahr
2016-09 - 2017-08

eWM, QM, PP Roll Out and new Implementation (expected goods receipts process)

Senior consultant ? EWM/ MM
Senior consultant ? EWM/ MM

  • Described several Business concept for eWM QM 
  • Specified, described and analyzed several GAPs 
  • Set up F & R (forecasting and Replenishment process)
  • Set up organization unit and Structure for EWM
  • Define the process flow in eWM
  • Pick, Pack
  • Packing
  • Data transfer between ERP and EWM / Core Interface (CIF)
  • Described and realized the expected Goods Receipt Process Expected Goods Receipt process and 
  • Putaway and Stock remova  Define strategy 
  • Described and realized Goods Issue Process
  1. Picking process
  2. Outbound delivery
  • Described and Sep up Internal Warehouse process
  • Replenishment process
  • Prepared the test case (Unit, Functional and integration test)
  • Created and prepared the test cases.
  • Analyzed and reviewed existing concepts
  • Prepared and conducted several work shop
  • Prepared and care out the proto type
  • Set up Master data at for eWM
  1. defined storage type
  2. Staging Areas, . Ware house Order, Ware house Task
  3. Stock determination
  • Physical Inventory process
  • QM for GR process
  • Created the technical documentation for the developer
  • Set up and described the quality planning data (Inspection plan, Routing, catalog, Inspection Characteristic, Class Characteristic, work center)
  • Physical Inventory process
  • Master Data clean and migration

    BonPrix
    Hamburg (Germany)
    11 Monate
    2015-10 - 2016-08

    Processing of several change request in PP/ MM and eWM module

    Senior consultant ? MM/SRM/PP/WM/eWM
    Senior consultant ? MM/SRM/PP/WM/eWM
    • Implementation optimization WM/MM
    • Warehouse Management Structure
    • Receiving Goods and finding the right place
    • Inbound delivery in WM
    • Replenishment process (Planned & Order related Replenishment)
    • Goods Issue
    • Physical Inventory
    • Production Integration
    • Stock Removal Options
    • Stock Removal Strategy
    • Picking Strategy
    • Wave Processing
    • Inbound Process with Inspection
    • Putaway with consolidation
    • Serial number and Batch process in WM
    • Described PtP process via SAP and optimizing
    • Purchase requisition, RfQ, Purchase order, Contract management
    • Defined implemented Call off and schedule Agreement process
    • Master data definition and selection (relevant for PtP process)
    • Realized ERP and EWM Integration
    • EWM Master Data Replication (ERP and eWM)
    • Receiving goods process described and implemented
    • Value Added Services
    • Storage control process (eWM)
    • Replenishment (via eWM)
    • Described Wave process and realized (eWM)
    • Cross Docking process described and realized
    • Slotting and Rearranment
    • Material Flow System analysed and described
    • Quality Inspection for goods recive
    • Described the basic Data for QM Process
    • Routing for GR process
    • Described the Catalog for QM
    • Inspection Lot
    • Described Process Usage Decision
    • Analysed the CR and suggested the solution of SAP
    • Prepared and conducted several work shop and meeting
    • The existing concept revived and extended
    • Described the Migration document via LSMW
    • Issue Analyse and problem solving
    • Prepared the test case and conducted testing
    • Purchase process described and extended for release startegy
    SAP AII
    Tuttlingen/ Locarno-Ebikon
    Tuttlingen
    4 Monate
    2015-10 - 2016-01

    Implementation MM/ REA

    Senior consultant ? MM/ SRM -PtP/ Retail/PP/Interface/EDI/WM/eWM
    Senior consultant ? MM/ SRM -PtP/ Retail/PP/Interface/EDI/WM/eWM
    Implementation MM / REA:  Stage of extention III / AS3 tinned food / and dry fruit (ZWWS: Ablösung Zentrale Waren Wirtschaft System ?Merkur?) Ausbaustufe III / AS3 Konserven und Trockenfrüchte 
    • Analysis of ?As-Is? processes and identification of change requirements for ?To-Be? processes (Fit/Gap)
    • Planning and roll-out preparation of work packages Identification and removal of potential road-blocks
    • Described PtP Process (RfQ and Quotation, Scheduling Agreement, Release Strategy for PR)
    • Defined and described master data for PtP (Info Record, Source list, Quota arrangement
    • Conditions (Prices, Discounts/Surcharges
    • Defined and described service condition
    • Set up message and printig
    • Definition and described of change requirements
    • Analyze existing process, described the future process
    • Described and developed procurement processes(Request for Quotation, Purchase requisition, Purchase order, contract, Purchase master data,   MRP (Consumption-Based Planning) , Release strategy, EDI, Message out put)
    • Defined and described Subcontracting, Logistic invoice verification, Inventory management processes
    • Prepared the data Migration concept and conducted
    • Created the Implementation concept and described
    • Describe specification and Forms
    • Describe the EWM process for customer
    • Described created the technical document for developer
    • Set up the customizing and documented
    • Preparation and execution the test case(Functional test and UAT)
    • Supervision of GoLive and support
    • Checked the existing Process in order to carry out the optimization.
    • Technical and organizational direction was developed and conducted.
    • Prepared and Carry out the guideline for International roll out.
    • Described the Logistics Invoice verification
    EDEKA/ LUNAR
    Hamburg (Germany)
    9 Monate
    2015-01 - 2015-09

    International SAP Rollout and Separates Company code and Merge of plants

    Senior consultant ? SRM/MM-PtP/PP /eWM/ Data Migration LSMW/Mast
    Senior consultant ? SRM/MM-PtP/PP /eWM/ Data Migration LSMW/Mast
    • Implemented new PtP process for south America (PR, PO and contract management
    • Described several Business concept (IM, WM eWM)
    • Realized ERP and eWM integration
    • Master Data replication
    • Described and implemented storage control process
    • Slotting and Rearrangement process
    • Described Value-Added Services
    • Wave Processing
    • Implementation optimization WM/MM
    • Warehouse Management Structure
    • Receiving Goods and finding the right place
    • Inbound delivery in WM
    • Replenishment process (Planned & Order related Replenishment)
    • Goods Issue
    • Physical Inventory
    • Production Integration
    • Stock Removal Options
    • Stock Removal Strategy
    • Picking Strategy
    • Prepared and accompanied Internationale Roll Out project /MM/PP/eWM
    • To find out the GAP / FIT Analyse and described
    • Set up the organization structure ERP und SRM
    • Prepared and conducted several work shop and meeting
    • The existing concept revived and extended
    • Described and prepared the subcontracting- and intern company process
    • Described the classic scenario at SRM and set up organization structure
    • Prepared the Cut Over and accompanied
    • Prepared and conducted the Function and Integration test
    • Described many customer requirement and change request
    • Prepared master data Mapping (Material Master, BOM, Routing, Work Place)
    • Organizational structure (eWM)
    • Receiving goods process described and implemented
    • Slotting and Rearrangement (eWM)
    • Physical Inventory (via eWM)
    • Value Added Services
    • Storage control process
    • Replenishment (eWM)
    • Interface ERP / eWM
    • Described the Migration document via LSMW
    • Migration inventory management for several Plants
    • Analysed and prepared purchasing and Inventory management process
    • Set up the System configuration
    • Issue Analyse and problem solving
    • Prepared the test case and conducted testing
    • Prepared the GoLive and support
    Knauf - Vattenfall
    German / EU / Abroad
    6 Monate
    2014-01 - 2014-06

    Neue Einführung SAP

    Senior SAP Berater MM/PP/WM und SRM
    Senior SAP Berater MM/PP/WM und SRM
    ? Einkaufsprozesse definiert in SRM und MM implementiert ? Ein neue SRM System wurde aufgebaut (Klassische Szenario) ? Optimierung vorhandene Einkaufsprozesse ? Einführung Chargen für einigen Materialien ? Implementierung Wareneingangsprüfung ? Neue Lagerorte definiert und implementiert ? Wareneingangsprüfung ? Lieferantenreklamation über SAP ? Logistikrechnungsprüfung ? Eingangsrechnungen ? Gutschrift und Belastung ? Automatische Abrechnungen (ERS) ? Konsignations- und Pipelineabrechnung
    Leser
    Berlin / Hamburg
    1 Jahr
    2013-01 - 2013-12

    Create and defined the gold template Global

    Senior consultant and Functional leadership of roll-out team ?Pt
    Senior consultant and Functional leadership of roll-out team ?Pt
    • Create and defined the gold template Global for Phoenix Contact (EVEREST)/ Implementation procurement process for Media-Saturn  
    • Presentation of implementation concept to client?s stakeholders
    • Analysis of ?As-Is? processes and identification of change requirements for ?To-Be? processes (Fit/Gap)
    • Defined, deployed and supported SAP solutions within the field of Manufacturing
    • Prepared several work shop regarding PtP processes
    • Described and wrote Blue Print document
    • Set up and PtP process and functionality at SAP
    • Active participation during the "Request for Proposal" phase: understanding client context, developing and presenting project approach
    • Management of a project work-stream and team as part of a complex project Identification of sell-on / new business opportunities
    • Planning and roll-out preparation of work packages Identification and removal of potential road-blocks
    • Coordination of client?s acceptance and buy-in Tracking and reporting of roll-out status
    • Regular alignment with Program Management
    • Described procurement process (PR, PO, RFQ, Contract, release startegy)
    • Described the Repetitive Manufacturing, Material requirement planning (MRP)
    • Set up the process flow of Production orders, Demand management, Routing, Subcontracting
    • Set up the process flow for Info record, Source list, Quota Arrangement
    • Prepared and conducted Meeting and work shop for SRM implementation
    • Described the procurement type and process flow via SRM
    • Classic scenario is described and prepared and conducted the prototype
    • Conducted the necessary System setting and connections (Defining Back-End Systems, Logical Systems and RFC Connections in the SAP SRM Landscape, Creating a Distribution Model?.etc)
    • Replication of Materials from ERP Back-End Systems to the SRM system
    • Creating the Organizational structure and set up Cross-Application Settings
    • Described the Document management DVS and implemented ( Document info record, Document structure, Document Distribution, defined document type, release of the document, assign to the object)
    • Solution Manager is used and configured for Project (Business Blueprint, Define the Business process structure)
    • Configuration of solution manager (for monitoring, Test and Documents)
    IBM/ Phonix Contact/ Media-Saturn
    Blomberg/ Ingolstadt
    11 Monate
    2012-02 - 2012-12

    various

    Senior consultant for MM/ SRM/ PP
    Senior consultant for MM/ SRM/ PP
      MM-PtP / PP and SRM Implementation / Roll out and extended of process/ 3th Level Support, Change requests, Roll out for USA, Mexico and Brazil. Implementation multi instance
      • Existing concept reworked and updated with new requirements
      • Extended the existing organization structure in SRM and described
      • Defined the process flow for Plan drive procurement (PDP) and MRP, Described the PDP process in ERP and SRM
      • Describe MRP process, Specified the high level technical document for developer
      • Defined the business process flow in SRM, New business requirement analyzed and discussed with purchasing department
      • Change request specified and implemented
      • Described multi instance process (with several backend system) and carried out the setting in SRM and ERP system
      • Roll out project prepared, planned and executed, Coming Issue analyzed and solved
      • Provided Global 3th Level Support, Prepared the training test case document
      • Trained and build the support team in Tunisia/Tunis
      • Organized several global telco in order to discuss the process flow
      Software AG/ Faurecia (Automotive)
      Karlsruhe, Tunisia
      2 Jahre 7 Monate
      2009-10 - 2012-04

      National and International Roll Out Project MM / SRM / WM / SP-Online

      Senior consultant for MM/ SRM/ WM/ SP-Online/ Concept e-Shop
      Senior consultant for MM/ SRM/ WM/ SP-Online/ Concept e-Shop
      • Describe Functional requirement (FD) / MM-Procurement and Inventory management ? SRM service and external procurement
      • Created concept for Master data migration, Described High level technical design (HLTD) (MM-Procurement and Inventory management ? SRM service and external procurement)
      • Revue and Approved Development design technical (DDT)
      • Purchasing (RFx, PR, PO, IV) Described several interface
      • Described Blueprint for MM process and SRM process and High Level Technical Design Document
      • Set up the Customizing, Described service procurement Process for BASF in SRM environment (SRM7.0) and SP-Online
      • Back-End Integration, Technical Basic setting (ALE, RFC destination)
      • Set up the Organization structure and user management
      • Described Bidding engine Process for BASF in SRM environment
      • Set up proto type for Sourcing (Bidding process and Live Auction process), Bidding list
      • Created concept for SUS process (Contractor and sub-contractor, BASF special), building the Prototype
      • Created concept for central contract Management (CCTR)in SAP SRM, (CCTR)
      • Described Contract distribution, Global Outline Agreement (GCTR) in ERP and SRM
      • Described and set up the process flow for Self-Service procurement (Shopping cart, confirmation of goods receipt, invoice)
      • Implemented and described Service Procurement (simple, complex and GAEB), Shopping carts in classic scenario SRM and ERP (MM-SRV)
      • Described Purchase requisition, Purchase order and reservation process
      • Master data replication (Vendor, product master)
      • Supported first and second level
      • Conducted Maintenance Processing (Order, Notification, Capacity requirements planning)
      • Create e-Shop concept
      • Support for SRM
      BASF/ Thyssenkrupp
      Ludwigshafen, Duisburg, Essen
      1 Jahr 11 Monate
      2007-11 - 2009-09

      Create the Template for Daimler group and International Roll Out Project (cbFC)

      Senior consultant for MM/ WM/ SRM 7.0/ Roll out project (USA, German) and Interface to subsystems/ MES
      Senior consultant for MM/ WM/ SRM 7.0/ Roll out project (USA, German) and Interface to subsystems/ MES
      • Describe the purchasing process (PO, PR, Contract, Schedule agreement), Describe several interface inside of SAP (FI/CO/SD/PP/MM), Set up the Customizing (MM/SRM)
      • Describe the subcontracting process and tested, Describe the interface to the subsystem, Prepared the data migration (Vendor and material master)
      • Describe and maintained d the Master data (Vendor, Material master)
      • Describe the SRM process (Classic scenarios) with catalog interface and Free text
      • Shopping carts for services in classic scenario (MM-SRV)
      • Contract Management in SAP SRM, Organization structure and user management
      • Describe the goods receipt process for US/Portland, Supported the business and the Business Relationship Management in the process to specify business requirements and in the preparation of change requests or project preparation, schedule agreement process (via Interface from GLOBUS), PR/PO from subsystem via interface
      • Invoice verification, Incoming invoice via interface and create through functional module, Account determination
      • Invoice verification in background (RMBABG00), Credit memo and debit memo process, Prepare and conduct workshops with the business to specify business requirements and discuss potential application solutions following the business and strategy
      • Developed and documented functional designs based on business requirements. Coordinated the development of the technical design and the development
      • Ensures the complex integration to other business processes as well as to other SAP modules, products, SAP sub systems (including interfaces).
      • Organize and/or support the user acceptance test for change requests and projects
      • Describe and wrote several Interface (SAP and no SAP) for fight liner in the USA
      • Created the Blueprint procurement process via SRM.
      • Optimized and Support for existing SRM (Classic scenario)
      • Prepare and execution the basic test / Quality test / Functional test and Integration test
      • Go live preparation and GLOBAL support (MM, SRM and Interface
      • Created the cost estimation for CR
      • Goods Issue posting, Schedule agreement for supplier
      • Delivery order processing, Sales order, Customer contract, Billing, Support (first and second level)
      • Estimated the effort for procurement team
      • Accompanied the cut over plan
      • Prepared the GoLive activities
      Daimler
      Stuttgart (Germany)
      8 Monate
      2007-04 - 2007-11

      Roll out and optimization project

      Senior consultant for MM/Retail/SRM/WM/QM - Authorization
      Senior consultant for MM/Retail/SRM/WM/QM - Authorization
      • The existing Blue Print document was analyzed, designed and extended
      • Prepare and conducted master data migration
      • Describe the purchasing process for different division
      • Checked the existing Process to find the optimization options
      • Technical and organizational structure was developed and implemented
      • Prepared and carry out the Upgrade project from EBP 4.0 to 5.0.
      • Prepared and Carry out the guideline for International roll out.
      • Prepared the configuration scrip and set up the customizing setting in SRM and SAP
      • Created, prepared and set up the meddle ware and replicated the Material and Vendor from ERP to SRM.
      • New Organization structure was created and maintained the necessary Attribute.
      • A new authorization concept was developed (for 21 Division and different country ca. 6000 Users).
      • Created and conducted the several Test cases and supported many country
      • Coming issue analyzed and elaborated solution and solved
      • Train the Key Users for the new application functionality
      • Cost Estimation for several change request
      • Described the defined the process flow for release strategy
      • Supported cut over plan
      • Prepared and conducted Go Live
      Metro (Wholesale and Retail)
      Düsseldorf (Germany)
      5 Monate
      2006-12 - 2007-04

      Roll out and Support project

      Senior consultant MM/SRM
      Senior consultant MM/SRM
      • Prepare and conducted several workshop -BIA (for PGS Team)
      • PGS= (Generated Demand, Manage Invoice, Manage Payments, Manage Inventory, Master Data)
      • Specifies the processes and Discuss the processes with Business and PGS Team
      • Care of logistical SAP MM and SRM in the productive system with the our local customers
      • The assignment focused on the business process design, the configuration and the change management of SAP SRM and MM, in addition with the content and catalogue management
      • Described the concept and created the prototype for various local business requirements
      • SAP MM and SRM process analyzed, carry large, international SAP projects (business and IT design, implementation, testing, training, cutover, Go Live and rollouts)
      • Involved on the project life cycle
      • Find out the GAP and described
      • Created business process optimization concept and process design
      • Responsible for full MM and SRM lifecycles
      • Implementation SAP MM and SRM carry out support and maintenance functions, as well as monitoring problems and offering solution
      • Problem analysis and remedy of the 2nd / 3rd level support of escalatory incidents
      • Periodic review and optimization of the process chains and development
      • Suggestions for improvement the process together with the customer
      • Created and proceed the cut over plan
      • First/Second level Support Worldwide ca. 2000 Users.
      IBM / Shell / Sony Ericsson
      Germany-Hamburg / Sweden-Stockholm
      7 Monate
      2006-05 - 2006-11

      Merging of Plants / Roll out and Support

      Senior consultant MM / SRM / PP
      Senior consultant MM / SRM / PP
      • Analyzed and revived of Logistics, Procurement, Inventory and or Production Planning related business requirements
      • Described and design functional of business requirements
      • Describe the purchasing process for different Location. Set up release strategy
      • Advising on Logistics, Procurement, Inventory and Production Planning related topics Development of target process documentation and of testing and training documents
      • Execution of tests, delivery of key - user and end - user training sessions, provision of post go live support
      • Identification of gaps between requirements and SAP PP / MM functionality
      • Co-ordination and implementation of technical designs
      • Prepared the data migration (Vendor and material master)
      • Configured / developed and designed SRM and MM processes
      • Described for each process a functional and technical part
      • Advised the Business department about the Process expirations
      • Prepared the plan for the merging of Plants
      • First and second Level Support
      • Carried out the Sarbanes-Oxley Act) SOX
      Celanese (Chemical)
      Germany / Frankfurt
      7 Monate
      2005-10 - 2006-04

      Template and Roll out project

      Senior consultant for MM / SRM
      Senior consultant for MM / SRM
      • Analysis and review of Logistics, Procurement, Inventory and or Production Planning related business processes to fully understand the client's requirements
      • Describe the purchasing process and conducted the customizing
      • Identification of gaps between requirements and SAP MM / SRM functionality
      • Prepared coordinated the master data migration
      • International roll-out of a classic scenarios (MM/SRM) with the responsibility for the functional and the technical implementation
      • The assignment focused on the As -Is-Analysis, the solution gap definition, the re-definition of 15 SRM / MM processes and interfaces (also to the HR module), system configuration and development, the design of the authorizations workflow, documentation, and live application support
      • Prepared and carry out the data replication (ERP and SRM)
      • Set up the Customizing setting in MM and SRM
      • Prepared and conducted several Work shop
      • Created and supported the test cases (Functional and UAT test)
      • Create the project plan and cut over plan
      • Trained the project team (MM and SRM)
      • Created cost estimated for CR and Planning the resource for the project
      • Prepared and supported the Go Live activity
      Accenture / T-Mobile
      Germany / Bonn
      3 Monate
      2005-07 - 2005-09

      Optimization and Support project

      Senior consultant for MM / SRM / PM
      Senior consultant for MM / SRM / PM
      • Existing purchasing process analysed and revived
      • Analysed and find out the optimization option in SAP (MM) and EBP system
      • The details of this assignment were the master data replication definition, the customizing, the middleware setup for EBP and ERP (RFC destination, ALE interfacing)
      • Defined and described two Report for the Monitoring for MM/SRM/PM processes
      • First and second level support world-wide done
      E-ON IS Energy
      Germany / Hannover
      1 Jahr
      2004-07 - 2005-06

      New Implementation SRM, QM and Support

      Senior consultant for MM / SRM / QM
      Senior consultant for MM / SRM / QM
      • Collected the Customer requirement SRM and QM
      • Analysed the Purchasing process via SRM and MM
      • Described procurement process in MM and SRM and Goods receipt via QM module
      • Analysed and map the needs of customers before advising on a suitable SAP-based solutions, taking on responsibility to devise an effective long-term
      • Design and implementation of complex solutions in the SAP MM and SSRM
      • Coordinated the data migration (Material master and vendor master)
      • Responsibilities: Business process design for purchasing and inventory management related business processes, configuration of the SAP modules MM / SRM
      • Act as a professional and technical contact bridge between business and IT to ensure that the SAP landscape is operated efficiently and according to regulatory requirements
      • Defined and created master data QM processing (Inspection planning, Inspection execution, inspection characteristics, Inspection Lot, result recording and execution, usage decision, content and catalogue management, and change management)
      • Taking care of everything from document management to product and process structure
      • Development of process optimization and implementation concepts, in combination with the prototyping for the generation of a business case and its evaluation.
      • Created and planned the project planning and Cut Over plan
      • Prepared and support the Go Live
      Dorma (Engineering)
      Germany / Enepetal

      Aus- und Weiterbildung

      Aus- und Weiterbildung

      1998
      Studium - Betriebswirtschaftslehre
      Technische Universität Berlin
      Schwerpunkt: Marketing (Konsumentenverhalten, Marktforschung, Werbung, Marketingmanagement)
      Abschluss: Diplomkaufmann


      1998
      Politikwissenschaft
      Technische Universität Berlin
      Schwerpunkt: Auslands -und Innenpolitik
      Abschluss: Magister Artium

      1991
      Studium - Betriebswirtschaftslehre in der Türkei
      Schwerpunkt: Personalwesen u. Führungslehre
      Abschluss: Betriebswirt (Lisans-Diplom)

      02/1998 - 02/1999
      Lehrgang Organisator/Berater Logistik für SAP R/3
      Siemens Nixdorf Informationssysteme AG, Training Center Berlin

      07/1991 - 12/1992
      Ausbildung zum DV-Kaufmann
      Computer Data Institut (CDI)

      Weiterbildung

      • Materialmanagement
        • D346MM Delta in der Materialwirtschaft 3.x-4.6c
      • Qualitätsmanagement (QM) M SAP R/3
        • LO715 Qualitätsmanagement in der Beschaffung Rel.4.0
        • LO750 Qualitätsmanagement Konfiguration und Organisation Rel.40
      • Controlling AC040-Level 2 Kosten- und Erlöscontrolling Rel.4.6c
      • CA930 Formulargestaltung mit SAPscript SAP
      • Instandhaltung (PM) SAP R/3
        • LO100 Instandhaltung
        • LO805 Verwaltung technischer Objekte
        • LO810 Instandshaltungs- und Serviceabwicklung
        • LO815 Instandhaltungsabwicklung
      • SAP Branchenlösung IS-U/CCS
        • Überblick IS-U/CCS
        • Grundfunktionen und Stammdaten
        • Kundenservice
        • Customer Interaction Center (CIC)
        • Geräteverwaltung
        • Energiedatenmanagement (EDM)
      • SRM - Zertifiziert -
      • Materialmanagement - Zertifiziert -

      Position

      Position

      SAP Logistik / SCM Berater (MM, SRM, WM, eWM, QM, PP, PM, SD, IS-Retail and DVS, S/4 HANA 

      Kompetenzen

      Kompetenzen

      Produkte / Standards / Erfahrungen / Methoden

      Software Tools

      • SAP:SRM, MM, WM, eWM, LSMW, QM, PP,  SD, REA, DMS,  SCM, Solution Manager, Master Data Manager FI/CO
       
      Release knowledge
      • SAP: 46C, 4.70 und SAP ECC 6.0
      • SRM: 2.0, 4.0, 5.0, 7.0, 7.1, 7.3
      • eWM: 7.01, 9.0
      • SUS: 7.1
      • MDM: 2.0 and 3.0

      Competency
      • Materials Management (SAP MM) and Supplier Relationship Management (SRM)
      • Warehouse management (LE-WM)
      • Extended Warehouse Management (EWM)
      • Production Planning (PP)
      • Quality Management (QM)
      • Manufacturing Execution System (MES)
      • Document Management System
      • S/4 HANA

      Betriebssysteme

      MS-DOS
      Windows

      Programmiersprachen

      ABAP4
      Cobol

      Datenbanken

      Access
      Paradox

      Datenkommunikation

      Internet, Intranet
      Windows Netzwerk

      Hardware

      PC
      Prozessrechner

      Branchen

      Branchen

      • Engineering
      • Telecommunication
      • Public Utility Housing Enterprise
      • Consultancy
      • Automotive
      • Energy
      • Chemical
      • Medical

      Einsatzorte

      Einsatzorte

      Deutschland, Österreich, Schweiz

      Weitere Länder: China, Hongkong, Japan, Korea (Nord), Korea (Süd), Macao, Mongolei, Taiwan

      nicht möglich

      Projekte

      Projekte

      7 Monate
      2021-01 - 2021-07

      MM / EWM - SAP S/4HANA implemantation

      Senior consultant ? MM / EWM/ S/4 HANA
      Senior consultant ? MM / EWM/ S/4 HANA

      • Organizational Structure for Production Supply defined
      • Setting Up the Integration to Production
      • Defined the Production Supply Area
      • Maintained PSA Table
      • Executing the Picks for Production
      • Goods Issue and Backflushing
      • Planned and Unplanned Replenishment
      • Order-Related Replenishment
      • Direct Replenishment
      • Automatic Replenishment
      • Rearrangement
      • Ad Hoc Warehouse Tasks
      • Posting Changes
      • Process-oriented storage control (POSC)
      • Layout-oriented storage control (LOSC)
      • Prepared decision document for EWM Integration into the SAP landscape
      • Picking and packing process 
      • Define and Parametrization Storage Types
      • Define strategy for GR and GI process
      • Define new Warehouse Process Type
      • Defined master data for cut over
      • Troubleshooting and problem-solving during migration projects

      Zürich (Switzerland)
      1 Jahr 4 Monate
      2019-09 - 2020-12

      eWM - MM ? S/4 HANA Roll Out Template/ Agile method Best Practice

      Senior consultant ? MM / EWM/ S/4 HANA
      Senior consultant ? MM / EWM/ S/4 HANA

      • Prepared decision document for EWM Integration into the SAP landscape
      • Inbound process described and realized
      • Outbound process described and realized
      • PMR process described and realized
      • Picking and packing process described customized
      • Set up EWM connection with EWM
      • Set up the organization structure for IM and EWM
      • Defined and described the warehouse structure
      • Set up the customizing documentation and described the setting
      • Defined the stock type
      • Described Business concept for eWM / IM
      • Set up the technical setting eWM and LE (General setting)
      • Set up the integration eWM and ERP
      • Conducted the delivery processing / Setting
      • Define and described master data (Storage type, Storage section, Storage bin, Storage Area, Activity are ?etc) in EWM
      • PSA process described and integration between EWM and PP
      • Define Warehouse document type
      • Define and Parametrization Storage Types
      • Prepare and conducted several Workshop 
      • HU ? Process described and realized
      • Defined the HU structure
      • A packaging material is created described for HU process
      • Goods receipt and Goods Issue process described and customized and documented.
      • Define strategy for GR and GI process
      • Described and realized Goods Issue Process
      1. Wave management process
      2. Picking process
      3. Outbound delivery
      4. Delivery process
      • Prepared and care out the proto type
      • Serial number management process described and realized in IM and EWM
      • Stock Transfers and Posting Changes
      • Batch Management process described and realized in IM / EWM
      • Product Transfer process in EWM described and realized
      • Defined master data for cut over

      Vaillant Remscheid
      Remscheid (Germany)
      8 Monate
      2019-01 - 2019-08

      eWM - MM ? S/4 HANA Roll Out Template

      Senior consultant ? MM / EWM/ S/4 HANA
      Senior consultant ? MM / EWM/ S/4 HANA

      • Described Purchase process (PR/PO and contract) and set up the customizing setting
      • Described and set up the Inter company process
      • Described the IM Structure and set up the customizing
      • Described Business concept for eWM
      • Defined and created organization structure for EWM
      • Determine Storage Type Search Sequence for Stock Removal
      • Prepare Workshop and conducted
      • GR Inbound delivery process
      • GI Outbound delivery process
      • Define strategy for GR and GI process
      • Wave management process
      • Picking process
      • Analyzed and reviewed existing concepts
      • Prepared and conducted several workshop
      • Prepared and care out the prototype
      • Set up Master data in ERP / EWM
      • Serialization and Butch management
      • Ware house Order / Ware house Task Process
      • STO process describe and set up the customizing in EWM and S4/HANA
      • Product supply integration

      RECARO/ Swiss Krono
      Schwäbisch Hall (Germany)
      8 Monate
      2019-01 - 2019-08

      eWM - MM ? S/4 HANA Roll Out

      Senior consultant ? MM / EWM/ S/4 HANA
      Senior consultant ? MM / EWM/ S/4 HANA

      • Described Business concept for eWM
      • Defined and created organization structure for EWM / IM
      • Process-Oriented Storage Control for Inbound Processes (POSC)
      • Layout Oriented Storage Control (LOSC)
      • Set up the customizing in EWM and ERP
      • Determine Storage Type Search Sequence for Stock Removal
      • HU and Packaging process Implemented
      • Packaging Specification describe, customizing and created
      • Described and realized the Goods Receipt Process (Inbound)
      • Described and realized the Goods issue Process (out bound)
      • Define and describe Storage type
      • Set up the setting for Storage type, regarding customer requirement
      • Define strategy for GR and GI process
      • Described and Sep up Internal Warehouse process
      • Define material Staging Area
      • Warehouse Task and Order Process
      • Prepared the test case (Unit, Functional and integration test)
      • Analyzed and reviewed existing concepts
      • Prepared and conducted several work shop
      • Prepared and care out the proto type
      • Set up Master data at for eWM
      1. defined storage type
      2. Define Storage Section
      3. Staging Areas
      4. Ware house Order /  Ware house Task
      5. Wave
      6. WAS Process
      7. Serial number process in EWM
      • Set up Master data in eWM / IM
      • Physical Inventory process

      V-ZUG
      Zürich (Switzerland)
      6 Monate
      2018-07 - 2018-12

      eWM - MM ? QM- S/4 HANA Roll Out and new Implementation/ Based on Model Companys MNC and Automotive

      Senior consultant ?/ MM - PtP / S/4 HANA
      Senior consultant ?/ MM - PtP / S/4 HANA

      • Described Business concept for eWM
      • Defined and created organization structure for EWM
      • Determine Storage Type Search Sequence for Stock Removal
      • Putaway process with strategy
      • Stock removal process with strategy
      • Outbound and Bound Process review extended
      • Handling Unit Implementation (HU) / packaging process
      • Set up organization unit and Structure for EWM and IM
      • Described and realized the Goods Receipt Process
      • Described and realized Goods Issue Process
      • Wave, Picking
      • Described and Sep up Internal Warehouse process
      • Warehouse Task and Order Process
      • Prepared the test case (Unit, Functional and integration test)
      • Analyzed and reviewed existing concepts
      • Prepared and conducted several work shop
      • Prepared and care out the proto type
      • Set up Master data at for eWM
      1. defined storage type
      2. Define Storage Section
      3. Staging Areas
      4. Ware house Order
      5. Ware house Task
      6. Serialnumbern process in EWM /S4/HANA (Embedded)
      • Data Migration
      • Cutover plan

      ODELO/ Automotive
      Stuttgart (Germany)
      1 Jahr 1 Monat
      2017-07 - 2018-07

      eWM - MM - S/4 HANA Roll Out and new Implementation

      Senior consultant ? WM / EWM / MM / S/4 HANA
      Senior consultant ? WM / EWM / MM / S/4 HANA

      Role/Skill/Task:

      • Described several Business concept for eWM
      • Specified, described and analyzed several GAPs and technical documents
      • SAP EWM Configuration incl. test, documentation and validation 
      • Set up organization unit and Structure for EWM
      • Define the process flow in eWM
      • Data transfer between ERP and EWM / Core Interface (CIF)
      • Described and realized the Goods Receipt Process
        • Inbound delivery
        • Expected Goods Receipt process and
        • Define strategy
      • Described and realized Goods Issue Process
        • Wave management process
        • Picking process
        • Outbound delivery
        • Delivery process
      • Described and Sep up Internal Warehouse process
      • Storage control
      • Define material Staging Area
      • Warehouse Task and Order Process
      • Replenishment process
      • Prepared the test case (Unit, Functional and integration test)
      • Created and prepared the test cases.
      • Analyzed and reviewed existing concepts
      • Prepared the scenario and conducted the test case
      • Prepared and conducted several work shop
      • Prepared and care out the proto type
      • Set up Master data at for eWM/ IM
        • defined storage type
        • Define Storage Section
        • Staging Areas
        • Ware house Order
        • Ware house Task
        • Stock determination
      Solar AG
      Germany, Dänemark
      1 Jahr
      2016-09 - 2017-08

      eWM, QM, PP Roll Out and new Implementation (expected goods receipts process)

      Senior consultant ? EWM/ MM
      Senior consultant ? EWM/ MM

      • Described several Business concept for eWM QM 
      • Specified, described and analyzed several GAPs 
      • Set up F & R (forecasting and Replenishment process)
      • Set up organization unit and Structure for EWM
      • Define the process flow in eWM
      • Pick, Pack
      • Packing
      • Data transfer between ERP and EWM / Core Interface (CIF)
      • Described and realized the expected Goods Receipt Process Expected Goods Receipt process and 
      • Putaway and Stock remova  Define strategy 
      • Described and realized Goods Issue Process
      1. Picking process
      2. Outbound delivery
      • Described and Sep up Internal Warehouse process
      • Replenishment process
      • Prepared the test case (Unit, Functional and integration test)
      • Created and prepared the test cases.
      • Analyzed and reviewed existing concepts
      • Prepared and conducted several work shop
      • Prepared and care out the proto type
      • Set up Master data at for eWM
      1. defined storage type
      2. Staging Areas, . Ware house Order, Ware house Task
      3. Stock determination
      • Physical Inventory process
      • QM for GR process
      • Created the technical documentation for the developer
      • Set up and described the quality planning data (Inspection plan, Routing, catalog, Inspection Characteristic, Class Characteristic, work center)
      • Physical Inventory process
      • Master Data clean and migration

        BonPrix
        Hamburg (Germany)
        11 Monate
        2015-10 - 2016-08

        Processing of several change request in PP/ MM and eWM module

        Senior consultant ? MM/SRM/PP/WM/eWM
        Senior consultant ? MM/SRM/PP/WM/eWM
        • Implementation optimization WM/MM
        • Warehouse Management Structure
        • Receiving Goods and finding the right place
        • Inbound delivery in WM
        • Replenishment process (Planned & Order related Replenishment)
        • Goods Issue
        • Physical Inventory
        • Production Integration
        • Stock Removal Options
        • Stock Removal Strategy
        • Picking Strategy
        • Wave Processing
        • Inbound Process with Inspection
        • Putaway with consolidation
        • Serial number and Batch process in WM
        • Described PtP process via SAP and optimizing
        • Purchase requisition, RfQ, Purchase order, Contract management
        • Defined implemented Call off and schedule Agreement process
        • Master data definition and selection (relevant for PtP process)
        • Realized ERP and EWM Integration
        • EWM Master Data Replication (ERP and eWM)
        • Receiving goods process described and implemented
        • Value Added Services
        • Storage control process (eWM)
        • Replenishment (via eWM)
        • Described Wave process and realized (eWM)
        • Cross Docking process described and realized
        • Slotting and Rearranment
        • Material Flow System analysed and described
        • Quality Inspection for goods recive
        • Described the basic Data for QM Process
        • Routing for GR process
        • Described the Catalog for QM
        • Inspection Lot
        • Described Process Usage Decision
        • Analysed the CR and suggested the solution of SAP
        • Prepared and conducted several work shop and meeting
        • The existing concept revived and extended
        • Described the Migration document via LSMW
        • Issue Analyse and problem solving
        • Prepared the test case and conducted testing
        • Purchase process described and extended for release startegy
        SAP AII
        Tuttlingen/ Locarno-Ebikon
        Tuttlingen
        4 Monate
        2015-10 - 2016-01

        Implementation MM/ REA

        Senior consultant ? MM/ SRM -PtP/ Retail/PP/Interface/EDI/WM/eWM
        Senior consultant ? MM/ SRM -PtP/ Retail/PP/Interface/EDI/WM/eWM
        Implementation MM / REA:  Stage of extention III / AS3 tinned food / and dry fruit (ZWWS: Ablösung Zentrale Waren Wirtschaft System ?Merkur?) Ausbaustufe III / AS3 Konserven und Trockenfrüchte 
        • Analysis of ?As-Is? processes and identification of change requirements for ?To-Be? processes (Fit/Gap)
        • Planning and roll-out preparation of work packages Identification and removal of potential road-blocks
        • Described PtP Process (RfQ and Quotation, Scheduling Agreement, Release Strategy for PR)
        • Defined and described master data for PtP (Info Record, Source list, Quota arrangement
        • Conditions (Prices, Discounts/Surcharges
        • Defined and described service condition
        • Set up message and printig
        • Definition and described of change requirements
        • Analyze existing process, described the future process
        • Described and developed procurement processes(Request for Quotation, Purchase requisition, Purchase order, contract, Purchase master data,   MRP (Consumption-Based Planning) , Release strategy, EDI, Message out put)
        • Defined and described Subcontracting, Logistic invoice verification, Inventory management processes
        • Prepared the data Migration concept and conducted
        • Created the Implementation concept and described
        • Describe specification and Forms
        • Describe the EWM process for customer
        • Described created the technical document for developer
        • Set up the customizing and documented
        • Preparation and execution the test case(Functional test and UAT)
        • Supervision of GoLive and support
        • Checked the existing Process in order to carry out the optimization.
        • Technical and organizational direction was developed and conducted.
        • Prepared and Carry out the guideline for International roll out.
        • Described the Logistics Invoice verification
        EDEKA/ LUNAR
        Hamburg (Germany)
        9 Monate
        2015-01 - 2015-09

        International SAP Rollout and Separates Company code and Merge of plants

        Senior consultant ? SRM/MM-PtP/PP /eWM/ Data Migration LSMW/Mast
        Senior consultant ? SRM/MM-PtP/PP /eWM/ Data Migration LSMW/Mast
        • Implemented new PtP process for south America (PR, PO and contract management
        • Described several Business concept (IM, WM eWM)
        • Realized ERP and eWM integration
        • Master Data replication
        • Described and implemented storage control process
        • Slotting and Rearrangement process
        • Described Value-Added Services
        • Wave Processing
        • Implementation optimization WM/MM
        • Warehouse Management Structure
        • Receiving Goods and finding the right place
        • Inbound delivery in WM
        • Replenishment process (Planned & Order related Replenishment)
        • Goods Issue
        • Physical Inventory
        • Production Integration
        • Stock Removal Options
        • Stock Removal Strategy
        • Picking Strategy
        • Prepared and accompanied Internationale Roll Out project /MM/PP/eWM
        • To find out the GAP / FIT Analyse and described
        • Set up the organization structure ERP und SRM
        • Prepared and conducted several work shop and meeting
        • The existing concept revived and extended
        • Described and prepared the subcontracting- and intern company process
        • Described the classic scenario at SRM and set up organization structure
        • Prepared the Cut Over and accompanied
        • Prepared and conducted the Function and Integration test
        • Described many customer requirement and change request
        • Prepared master data Mapping (Material Master, BOM, Routing, Work Place)
        • Organizational structure (eWM)
        • Receiving goods process described and implemented
        • Slotting and Rearrangement (eWM)
        • Physical Inventory (via eWM)
        • Value Added Services
        • Storage control process
        • Replenishment (eWM)
        • Interface ERP / eWM
        • Described the Migration document via LSMW
        • Migration inventory management for several Plants
        • Analysed and prepared purchasing and Inventory management process
        • Set up the System configuration
        • Issue Analyse and problem solving
        • Prepared the test case and conducted testing
        • Prepared the GoLive and support
        Knauf - Vattenfall
        German / EU / Abroad
        6 Monate
        2014-01 - 2014-06

        Neue Einführung SAP

        Senior SAP Berater MM/PP/WM und SRM
        Senior SAP Berater MM/PP/WM und SRM
        ? Einkaufsprozesse definiert in SRM und MM implementiert ? Ein neue SRM System wurde aufgebaut (Klassische Szenario) ? Optimierung vorhandene Einkaufsprozesse ? Einführung Chargen für einigen Materialien ? Implementierung Wareneingangsprüfung ? Neue Lagerorte definiert und implementiert ? Wareneingangsprüfung ? Lieferantenreklamation über SAP ? Logistikrechnungsprüfung ? Eingangsrechnungen ? Gutschrift und Belastung ? Automatische Abrechnungen (ERS) ? Konsignations- und Pipelineabrechnung
        Leser
        Berlin / Hamburg
        1 Jahr
        2013-01 - 2013-12

        Create and defined the gold template Global

        Senior consultant and Functional leadership of roll-out team ?Pt
        Senior consultant and Functional leadership of roll-out team ?Pt
        • Create and defined the gold template Global for Phoenix Contact (EVEREST)/ Implementation procurement process for Media-Saturn  
        • Presentation of implementation concept to client?s stakeholders
        • Analysis of ?As-Is? processes and identification of change requirements for ?To-Be? processes (Fit/Gap)
        • Defined, deployed and supported SAP solutions within the field of Manufacturing
        • Prepared several work shop regarding PtP processes
        • Described and wrote Blue Print document
        • Set up and PtP process and functionality at SAP
        • Active participation during the "Request for Proposal" phase: understanding client context, developing and presenting project approach
        • Management of a project work-stream and team as part of a complex project Identification of sell-on / new business opportunities
        • Planning and roll-out preparation of work packages Identification and removal of potential road-blocks
        • Coordination of client?s acceptance and buy-in Tracking and reporting of roll-out status
        • Regular alignment with Program Management
        • Described procurement process (PR, PO, RFQ, Contract, release startegy)
        • Described the Repetitive Manufacturing, Material requirement planning (MRP)
        • Set up the process flow of Production orders, Demand management, Routing, Subcontracting
        • Set up the process flow for Info record, Source list, Quota Arrangement
        • Prepared and conducted Meeting and work shop for SRM implementation
        • Described the procurement type and process flow via SRM
        • Classic scenario is described and prepared and conducted the prototype
        • Conducted the necessary System setting and connections (Defining Back-End Systems, Logical Systems and RFC Connections in the SAP SRM Landscape, Creating a Distribution Model?.etc)
        • Replication of Materials from ERP Back-End Systems to the SRM system
        • Creating the Organizational structure and set up Cross-Application Settings
        • Described the Document management DVS and implemented ( Document info record, Document structure, Document Distribution, defined document type, release of the document, assign to the object)
        • Solution Manager is used and configured for Project (Business Blueprint, Define the Business process structure)
        • Configuration of solution manager (for monitoring, Test and Documents)
        IBM/ Phonix Contact/ Media-Saturn
        Blomberg/ Ingolstadt
        11 Monate
        2012-02 - 2012-12

        various

        Senior consultant for MM/ SRM/ PP
        Senior consultant for MM/ SRM/ PP
          MM-PtP / PP and SRM Implementation / Roll out and extended of process/ 3th Level Support, Change requests, Roll out for USA, Mexico and Brazil. Implementation multi instance
          • Existing concept reworked and updated with new requirements
          • Extended the existing organization structure in SRM and described
          • Defined the process flow for Plan drive procurement (PDP) and MRP, Described the PDP process in ERP and SRM
          • Describe MRP process, Specified the high level technical document for developer
          • Defined the business process flow in SRM, New business requirement analyzed and discussed with purchasing department
          • Change request specified and implemented
          • Described multi instance process (with several backend system) and carried out the setting in SRM and ERP system
          • Roll out project prepared, planned and executed, Coming Issue analyzed and solved
          • Provided Global 3th Level Support, Prepared the training test case document
          • Trained and build the support team in Tunisia/Tunis
          • Organized several global telco in order to discuss the process flow
          Software AG/ Faurecia (Automotive)
          Karlsruhe, Tunisia
          2 Jahre 7 Monate
          2009-10 - 2012-04

          National and International Roll Out Project MM / SRM / WM / SP-Online

          Senior consultant for MM/ SRM/ WM/ SP-Online/ Concept e-Shop
          Senior consultant for MM/ SRM/ WM/ SP-Online/ Concept e-Shop
          • Describe Functional requirement (FD) / MM-Procurement and Inventory management ? SRM service and external procurement
          • Created concept for Master data migration, Described High level technical design (HLTD) (MM-Procurement and Inventory management ? SRM service and external procurement)
          • Revue and Approved Development design technical (DDT)
          • Purchasing (RFx, PR, PO, IV) Described several interface
          • Described Blueprint for MM process and SRM process and High Level Technical Design Document
          • Set up the Customizing, Described service procurement Process for BASF in SRM environment (SRM7.0) and SP-Online
          • Back-End Integration, Technical Basic setting (ALE, RFC destination)
          • Set up the Organization structure and user management
          • Described Bidding engine Process for BASF in SRM environment
          • Set up proto type for Sourcing (Bidding process and Live Auction process), Bidding list
          • Created concept for SUS process (Contractor and sub-contractor, BASF special), building the Prototype
          • Created concept for central contract Management (CCTR)in SAP SRM, (CCTR)
          • Described Contract distribution, Global Outline Agreement (GCTR) in ERP and SRM
          • Described and set up the process flow for Self-Service procurement (Shopping cart, confirmation of goods receipt, invoice)
          • Implemented and described Service Procurement (simple, complex and GAEB), Shopping carts in classic scenario SRM and ERP (MM-SRV)
          • Described Purchase requisition, Purchase order and reservation process
          • Master data replication (Vendor, product master)
          • Supported first and second level
          • Conducted Maintenance Processing (Order, Notification, Capacity requirements planning)
          • Create e-Shop concept
          • Support for SRM
          BASF/ Thyssenkrupp
          Ludwigshafen, Duisburg, Essen
          1 Jahr 11 Monate
          2007-11 - 2009-09

          Create the Template for Daimler group and International Roll Out Project (cbFC)

          Senior consultant for MM/ WM/ SRM 7.0/ Roll out project (USA, German) and Interface to subsystems/ MES
          Senior consultant for MM/ WM/ SRM 7.0/ Roll out project (USA, German) and Interface to subsystems/ MES
          • Describe the purchasing process (PO, PR, Contract, Schedule agreement), Describe several interface inside of SAP (FI/CO/SD/PP/MM), Set up the Customizing (MM/SRM)
          • Describe the subcontracting process and tested, Describe the interface to the subsystem, Prepared the data migration (Vendor and material master)
          • Describe and maintained d the Master data (Vendor, Material master)
          • Describe the SRM process (Classic scenarios) with catalog interface and Free text
          • Shopping carts for services in classic scenario (MM-SRV)
          • Contract Management in SAP SRM, Organization structure and user management
          • Describe the goods receipt process for US/Portland, Supported the business and the Business Relationship Management in the process to specify business requirements and in the preparation of change requests or project preparation, schedule agreement process (via Interface from GLOBUS), PR/PO from subsystem via interface
          • Invoice verification, Incoming invoice via interface and create through functional module, Account determination
          • Invoice verification in background (RMBABG00), Credit memo and debit memo process, Prepare and conduct workshops with the business to specify business requirements and discuss potential application solutions following the business and strategy
          • Developed and documented functional designs based on business requirements. Coordinated the development of the technical design and the development
          • Ensures the complex integration to other business processes as well as to other SAP modules, products, SAP sub systems (including interfaces).
          • Organize and/or support the user acceptance test for change requests and projects
          • Describe and wrote several Interface (SAP and no SAP) for fight liner in the USA
          • Created the Blueprint procurement process via SRM.
          • Optimized and Support for existing SRM (Classic scenario)
          • Prepare and execution the basic test / Quality test / Functional test and Integration test
          • Go live preparation and GLOBAL support (MM, SRM and Interface
          • Created the cost estimation for CR
          • Goods Issue posting, Schedule agreement for supplier
          • Delivery order processing, Sales order, Customer contract, Billing, Support (first and second level)
          • Estimated the effort for procurement team
          • Accompanied the cut over plan
          • Prepared the GoLive activities
          Daimler
          Stuttgart (Germany)
          8 Monate
          2007-04 - 2007-11

          Roll out and optimization project

          Senior consultant for MM/Retail/SRM/WM/QM - Authorization
          Senior consultant for MM/Retail/SRM/WM/QM - Authorization
          • The existing Blue Print document was analyzed, designed and extended
          • Prepare and conducted master data migration
          • Describe the purchasing process for different division
          • Checked the existing Process to find the optimization options
          • Technical and organizational structure was developed and implemented
          • Prepared and carry out the Upgrade project from EBP 4.0 to 5.0.
          • Prepared and Carry out the guideline for International roll out.
          • Prepared the configuration scrip and set up the customizing setting in SRM and SAP
          • Created, prepared and set up the meddle ware and replicated the Material and Vendor from ERP to SRM.
          • New Organization structure was created and maintained the necessary Attribute.
          • A new authorization concept was developed (for 21 Division and different country ca. 6000 Users).
          • Created and conducted the several Test cases and supported many country
          • Coming issue analyzed and elaborated solution and solved
          • Train the Key Users for the new application functionality
          • Cost Estimation for several change request
          • Described the defined the process flow for release strategy
          • Supported cut over plan
          • Prepared and conducted Go Live
          Metro (Wholesale and Retail)
          Düsseldorf (Germany)
          5 Monate
          2006-12 - 2007-04

          Roll out and Support project

          Senior consultant MM/SRM
          Senior consultant MM/SRM
          • Prepare and conducted several workshop -BIA (for PGS Team)
          • PGS= (Generated Demand, Manage Invoice, Manage Payments, Manage Inventory, Master Data)
          • Specifies the processes and Discuss the processes with Business and PGS Team
          • Care of logistical SAP MM and SRM in the productive system with the our local customers
          • The assignment focused on the business process design, the configuration and the change management of SAP SRM and MM, in addition with the content and catalogue management
          • Described the concept and created the prototype for various local business requirements
          • SAP MM and SRM process analyzed, carry large, international SAP projects (business and IT design, implementation, testing, training, cutover, Go Live and rollouts)
          • Involved on the project life cycle
          • Find out the GAP and described
          • Created business process optimization concept and process design
          • Responsible for full MM and SRM lifecycles
          • Implementation SAP MM and SRM carry out support and maintenance functions, as well as monitoring problems and offering solution
          • Problem analysis and remedy of the 2nd / 3rd level support of escalatory incidents
          • Periodic review and optimization of the process chains and development
          • Suggestions for improvement the process together with the customer
          • Created and proceed the cut over plan
          • First/Second level Support Worldwide ca. 2000 Users.
          IBM / Shell / Sony Ericsson
          Germany-Hamburg / Sweden-Stockholm
          7 Monate
          2006-05 - 2006-11

          Merging of Plants / Roll out and Support

          Senior consultant MM / SRM / PP
          Senior consultant MM / SRM / PP
          • Analyzed and revived of Logistics, Procurement, Inventory and or Production Planning related business requirements
          • Described and design functional of business requirements
          • Describe the purchasing process for different Location. Set up release strategy
          • Advising on Logistics, Procurement, Inventory and Production Planning related topics Development of target process documentation and of testing and training documents
          • Execution of tests, delivery of key - user and end - user training sessions, provision of post go live support
          • Identification of gaps between requirements and SAP PP / MM functionality
          • Co-ordination and implementation of technical designs
          • Prepared the data migration (Vendor and material master)
          • Configured / developed and designed SRM and MM processes
          • Described for each process a functional and technical part
          • Advised the Business department about the Process expirations
          • Prepared the plan for the merging of Plants
          • First and second Level Support
          • Carried out the Sarbanes-Oxley Act) SOX
          Celanese (Chemical)
          Germany / Frankfurt
          7 Monate
          2005-10 - 2006-04

          Template and Roll out project

          Senior consultant for MM / SRM
          Senior consultant for MM / SRM
          • Analysis and review of Logistics, Procurement, Inventory and or Production Planning related business processes to fully understand the client's requirements
          • Describe the purchasing process and conducted the customizing
          • Identification of gaps between requirements and SAP MM / SRM functionality
          • Prepared coordinated the master data migration
          • International roll-out of a classic scenarios (MM/SRM) with the responsibility for the functional and the technical implementation
          • The assignment focused on the As -Is-Analysis, the solution gap definition, the re-definition of 15 SRM / MM processes and interfaces (also to the HR module), system configuration and development, the design of the authorizations workflow, documentation, and live application support
          • Prepared and carry out the data replication (ERP and SRM)
          • Set up the Customizing setting in MM and SRM
          • Prepared and conducted several Work shop
          • Created and supported the test cases (Functional and UAT test)
          • Create the project plan and cut over plan
          • Trained the project team (MM and SRM)
          • Created cost estimated for CR and Planning the resource for the project
          • Prepared and supported the Go Live activity
          Accenture / T-Mobile
          Germany / Bonn
          3 Monate
          2005-07 - 2005-09

          Optimization and Support project

          Senior consultant for MM / SRM / PM
          Senior consultant for MM / SRM / PM
          • Existing purchasing process analysed and revived
          • Analysed and find out the optimization option in SAP (MM) and EBP system
          • The details of this assignment were the master data replication definition, the customizing, the middleware setup for EBP and ERP (RFC destination, ALE interfacing)
          • Defined and described two Report for the Monitoring for MM/SRM/PM processes
          • First and second level support world-wide done
          E-ON IS Energy
          Germany / Hannover
          1 Jahr
          2004-07 - 2005-06

          New Implementation SRM, QM and Support

          Senior consultant for MM / SRM / QM
          Senior consultant for MM / SRM / QM
          • Collected the Customer requirement SRM and QM
          • Analysed the Purchasing process via SRM and MM
          • Described procurement process in MM and SRM and Goods receipt via QM module
          • Analysed and map the needs of customers before advising on a suitable SAP-based solutions, taking on responsibility to devise an effective long-term
          • Design and implementation of complex solutions in the SAP MM and SSRM
          • Coordinated the data migration (Material master and vendor master)
          • Responsibilities: Business process design for purchasing and inventory management related business processes, configuration of the SAP modules MM / SRM
          • Act as a professional and technical contact bridge between business and IT to ensure that the SAP landscape is operated efficiently and according to regulatory requirements
          • Defined and created master data QM processing (Inspection planning, Inspection execution, inspection characteristics, Inspection Lot, result recording and execution, usage decision, content and catalogue management, and change management)
          • Taking care of everything from document management to product and process structure
          • Development of process optimization and implementation concepts, in combination with the prototyping for the generation of a business case and its evaluation.
          • Created and planned the project planning and Cut Over plan
          • Prepared and support the Go Live
          Dorma (Engineering)
          Germany / Enepetal

          Aus- und Weiterbildung

          Aus- und Weiterbildung

          1998
          Studium - Betriebswirtschaftslehre
          Technische Universität Berlin
          Schwerpunkt: Marketing (Konsumentenverhalten, Marktforschung, Werbung, Marketingmanagement)
          Abschluss: Diplomkaufmann


          1998
          Politikwissenschaft
          Technische Universität Berlin
          Schwerpunkt: Auslands -und Innenpolitik
          Abschluss: Magister Artium

          1991
          Studium - Betriebswirtschaftslehre in der Türkei
          Schwerpunkt: Personalwesen u. Führungslehre
          Abschluss: Betriebswirt (Lisans-Diplom)

          02/1998 - 02/1999
          Lehrgang Organisator/Berater Logistik für SAP R/3
          Siemens Nixdorf Informationssysteme AG, Training Center Berlin

          07/1991 - 12/1992
          Ausbildung zum DV-Kaufmann
          Computer Data Institut (CDI)

          Weiterbildung

          • Materialmanagement
            • D346MM Delta in der Materialwirtschaft 3.x-4.6c
          • Qualitätsmanagement (QM) M SAP R/3
            • LO715 Qualitätsmanagement in der Beschaffung Rel.4.0
            • LO750 Qualitätsmanagement Konfiguration und Organisation Rel.40
          • Controlling AC040-Level 2 Kosten- und Erlöscontrolling Rel.4.6c
          • CA930 Formulargestaltung mit SAPscript SAP
          • Instandhaltung (PM) SAP R/3
            • LO100 Instandhaltung
            • LO805 Verwaltung technischer Objekte
            • LO810 Instandshaltungs- und Serviceabwicklung
            • LO815 Instandhaltungsabwicklung
          • SAP Branchenlösung IS-U/CCS
            • Überblick IS-U/CCS
            • Grundfunktionen und Stammdaten
            • Kundenservice
            • Customer Interaction Center (CIC)
            • Geräteverwaltung
            • Energiedatenmanagement (EDM)
          • SRM - Zertifiziert -
          • Materialmanagement - Zertifiziert -

          Position

          Position

          SAP Logistik / SCM Berater (MM, SRM, WM, eWM, QM, PP, PM, SD, IS-Retail and DVS, S/4 HANA 

          Kompetenzen

          Kompetenzen

          Produkte / Standards / Erfahrungen / Methoden

          Software Tools

          • SAP:SRM, MM, WM, eWM, LSMW, QM, PP,  SD, REA, DMS,  SCM, Solution Manager, Master Data Manager FI/CO
           
          Release knowledge
          • SAP: 46C, 4.70 und SAP ECC 6.0
          • SRM: 2.0, 4.0, 5.0, 7.0, 7.1, 7.3
          • eWM: 7.01, 9.0
          • SUS: 7.1
          • MDM: 2.0 and 3.0

          Competency
          • Materials Management (SAP MM) and Supplier Relationship Management (SRM)
          • Warehouse management (LE-WM)
          • Extended Warehouse Management (EWM)
          • Production Planning (PP)
          • Quality Management (QM)
          • Manufacturing Execution System (MES)
          • Document Management System
          • S/4 HANA

          Betriebssysteme

          MS-DOS
          Windows

          Programmiersprachen

          ABAP4
          Cobol

          Datenbanken

          Access
          Paradox

          Datenkommunikation

          Internet, Intranet
          Windows Netzwerk

          Hardware

          PC
          Prozessrechner

          Branchen

          Branchen

          • Engineering
          • Telecommunication
          • Public Utility Housing Enterprise
          • Consultancy
          • Automotive
          • Energy
          • Chemical
          • Medical

          Vertrauen Sie auf GULP

          Im Bereich Freelancing
          Im Bereich Arbeitnehmerüberlassung / Personalvermittlung

          Fragen?

          Rufen Sie uns an +49 89 500316-300 oder schreiben Sie uns:

          Das GULP Freelancer-Portal

          Direktester geht's nicht! Ganz einfach Freelancer finden und direkt Kontakt aufnehmen.